# CodeMark evaluation and Product Quality Plan

CodeMark Australia | Blank worksheet

Step: Assemble test evidence and the Product Quality Plan
Owner: Engineering + factory quality + certification body
When: Before evaluation and factory review

## Gather first
- Agreed scope matrix
- Full lab reports
- Controlled drawings and specifications
- Factory process map
- Appendix 1 requirements

## How to prepare it
1. Map the bill of materials, installed configuration and production process to the tested sample and report. Get written decisions on variations and evidence gaps.
2. For each Appendix 1 requirement, name the procedure, person, frequency and evidence. Include incoming checks, manufacturing inspections, release, traceability, corrective action, complaints and recall.
3. Review records from one trial lot before submitting. Track each evaluation finding with the requested action, owner, due date and certifier confirmation.

## Fill in

### Incoming check
[Add details here]

### Trace exercise
[Add details here]

### Finding example
[Add details here]

## Review
A reviewer can link the tested configuration to production controls and verify open and closed findings.

## Handoff
Give the certifier a dated copy. Keep the approved version accessible to production and field quality staff.

Official reference: CodeMark rules and Appendix 1
https://codemark.abcb.gov.au/sites/default/files/resources/2022/CodeMark-australia-scheme-rules-2016-2.pdf

Use the current rules and any prescribed forms for your engagement.
