# Australia AML technology release test file

Australia FATF 2018 follow-up | Worked example with fictional data

Step: Test the release and record independent review
Owner: Quality assurance + operational control owners + AML reviewer
When: After implementation and before the release decision

## Gather first
- Risk and control matrix
- Release manifest
- Synthetic onboarding cases
- Reviewer permissions
- Expected records and retention rules

## How to prepare it
1. Choose cases for each critical control, including normal processing, referrals and incomplete files. Document the expected result and required evidence.
2. Run each case in the candidate release. Record its input, output, release version, reviewer, evidence reference and time. Assign defects to named owners.
3. Retest after fixes and preserve the original and later results. Have the AML reviewer sign the conclusion with test coverage and unresolved limitations.

## Example

### Fictional referral test
Case AU-TECH-12 supplies contradictory ownership records. The system routes it to the authorised reviewer and retains evidence of the assigned decision.

### Fictional retest
The first run dropped an attachment reference. The team fixes it and retains both test results and the new release identifier.

## Review
A reviewer can reproduce the planned cases and verify how each failure or limitation was resolved or escalated.

## Handoff
Provide the signed evidence and open items to the senior manager and release owner.

Official reference: AUSTRAC policy and controls guidance
https://www.austrac.gov.au/industry-and-business/obligations-and-guidance/your-amlctf-program/develop-your-amlctf-programs/step-3-manage-and-mitigate-your-risks-amlctf-policies

Use the current rules and any prescribed forms for your engagement.