Start hereDetermine scope and target maturity
~105 days leftOpen step
Guide library
Framework Asia–Pacific

Essential Eight

ASD Essential Eight Maturity Model

Assess the maturity of common cyber mitigations and improve them together.

Who it applies to

Australian organizations using ASD’s baseline mitigation strategies, including entities with separate government or contractual expectations.

What you’ll produce

Evidence-backed maturity assessment and improvement roadmap.

Set target maturity using your threat profile and applicable policy. Avoid treating a strong result in one mitigation as covering weaknesses elsewhere.

TEAM KICKOFF

Run the project

Go to the roadmap

Decisions for leadership

Which risks will we reduce and how will we measure it?
Set a target for each priority service or outcome. Use a current baseline to decide the investment needed, what can be phased in, and who accepts remaining risk.
Who will do the work and who can sign?
Appoint a sponsor, a day-to-day lead and a named owner for every workstream. Set aside their time and decide who can approve the outcome, accept remaining risk or authorize a filing.
Which deadlines can we promise?
Separate fixed external dates from internal targets. Confirm dependencies such as a vendor, test lab or assessor, and approve a backup plan if their dates slip.

How to spend the first week

  1. Ask the first-step owner to bring the most recent system, activity or product inventory and the contract or rule driving the work.
  2. Select one service and test a high-impact control with its owner. Record what actually happened, what failed and the proposed target.
  3. Record what the sponsor approved, open questions, work owners and the next date a decision is needed. Send the brief to everyone who needs to contribute evidence.

What to review each week

Monitor progress against the target, failed control tests and gaps that leave a critical service exposed.

Kickoff brief to share with your team

Fill this in with your sponsor and send it to the people who own the work.

Essential Eight kickoff brief
Business reason and required outcome  [Contract, obligation or approval]
Scope and exclusions  [Entities, systems or activities, and reasons]
Fixed deadlines and internal milestones  [Date, source and owner]
Executive sponsor and authorized signer  [Names]
Project lead and backup  [Names]
First workstream  Determine scope and target maturity · Security lead + business owners [Name and due date]
People, effort and external costs  [Estimate, owner and contingency]
Evidence folder and reviewer access  [Location, access owner and review date]
Decisions and blockers  [Item, options, owner and decision date]

First week
1. Ask the first-step owner to bring the most recent system, activity or product inventory and the contract or rule driving the work.
2. Select one service and test a high-impact control with its owner. Record what actually happened, what failed and the proposed target.
3. Record what the sponsor approved, open questions, work owners and the next date a decision is needed. Send the brief to everyone who needs to contribute evidence.
How to hand off evidence
  1. Record the requirement or claim, the person responsible, the period and the result. Link to the original report, configuration, test or case record.
  2. Include the version, system or product, date, and how you gathered the record. When a report covers a group of items, retain its filters and reconcile the count to the source.
  3. Ask the reviewer to open the evidence and reproduce the key check. Record their decision and date. Keep missing items or failures visible with an owner, a due date and a retest when needed.
  4. Share through the agreed channel. Keep sensitive originals in a restricted location and link any redacted copies to the corresponding originals.
The whole journeyabout 105 days across 4 steps
  1. 01Determine scope and target maturitySecurity lead + business owners · ~14 days
  2. 02Baseline the eight strategiesIT operations + assessor · ~28 days
  3. 03Remediate by exposure and feasibilityEngineering + system owners · ~42 days
  4. 04Validate and report improvementsAssessor + leadership · ~21 days
IMPLEMENTATION ROADMAP

Step by step

Checklist, instructions and 9 templates.

View plan as a table
Project roadmap with current target dates and completion status
StepOwnerWhen to actEstimated targetDeliverablesStatus
Determine scope and target maturitySecurity lead + business ownersBefore evidence collectionSet a start dateScope memo; Target and assessment planOpen
Baseline the eight strategiesIT operations + assessorAt assessmentSet a start dateControl evidence; Assessed maturity resultsOpen
Remediate by exposure and feasibilityEngineering + system ownersBased on risk and policySet a start datePrioritized backlog; Exception decisions; Rollout evidenceOpen
Validate and report improvementsAssessor + leadershipAt follow-up and policy cadenceSet a start dateFollow-up report; Maturity roadmapOpen
0 of 4 completeOpen workspace

Targets use illustrative calendar-day estimates and assume the steps run in sequence. Check official dates and agree real durations with your team.

  1. 01

    Determine scope and target maturity

    Who Security lead + business owners When Before evidence collection

    Define systems and operating environments, applicable policy and target maturity. Select assessment evidence and sampling approach.

    What to produce

    Scope memoMemo

    Gather first

    • Service inventory and architecture
    • Customer commitments and contracts
    • Applicable criteria or legal text

    How to prepare it

    1. Write the exact decision this memo supports. Name the legal entity, service, environments and dates. Attach a boundary diagram and state which people, vendors and processes can affect the scope.
    2. List the exclusions next to the inclusion list. Give a reason for each one and describe any shared service that crosses the boundary.
    3. Review the draft with service owners and the person making the decision. Freeze the approved version and add a review date or trigger for changes.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Decision
    Cover the hosted billing service for the April to June review.
    In scope
    Production billing API, hosting, releases and production access.
    Excluded and why
    Internal HR tool. It has no access to billing systems or data.
    Dependencies
    Cloud hosting and corporate identity provider.
    Approval
    Service owner approves after checking the architecture and contract.

    Check before handing it over

    A reviewer can use the memo to classify a named system and see how shared dependencies are handled.

    Give the approved scope and any open questions to whoever will map requirements, select samples or review the engagement.

    Target and assessment planMemo

    Gather first

    • Approved scope
    • Governing requirements and risks
    • Teams, service dependencies and review gates

    How to prepare it

    1. State the objective, scope, accountable owner and conditions that trigger action. Translate commitments into tasks with periods, thresholds and evidence.
    2. For each task set the input, decision rule, output and handoff. Include escalation for failures and approvals for exceptions.
    3. Walk through one real case with owners and reviewers. Approve the version, schedule review, and check that promised tasks have operational records.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Purpose
    Identify failed production backup jobs and restore service data.
    Scope
    Production billing databases and backup vault
    Activity and timing
    On-call reviews daily job alerts and runs a quarterly restore test.
    Evidence and exception
    Keep job records and restore test output. Page the service owner if a job fails.
    Owner and approval
    Operations lead owns. Service owner approves.

    Check before handing it over

    A person who receives the plan can tell when to act, what to check and where to save the result.

    Give the approved plan to the people responsible for operation. Add dated checkpoints to the working calendar.

  2. 02

    Baseline the eight strategies

    Who IT operations + assessor When At assessment

    Review application control, patching, macro restrictions, hardening, admin privileges, MFA and backups against applicable criteria.

    What to produce

    Control evidenceSpreadsheet

    Gather first

    • Control descriptions and test request
    • Source system records
    • Defined period and evidence access rules

    How to prepare it

    1. Create a register keyed by control, requirement or request. Export native records with the filters, timestamps and operator details needed to interpret them.
    2. Link to a restricted copy of each artifact. Note time zone, scope, date range, export method and whether the evidence shows design or actual operation.
    3. Test the links using the reviewer’s permissions. Flag missing periods or evidence and track a follow-up instead of filling in records retrospectively.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Evidence ID
    EV-021
    Control or request
    AC-04, October administrator review
    Period and scope
    1 to 31 Oct 2026 UTC, production tenant
    Source and capture
    IAM export filtered to active elevated roles
    Link or record ID
    Restricted workpaper EV-021 plus ticket IAM-114
    Reviewer and status
    Security assurance, verified

    Check before handing it over

    A reviewer can open the right file, reproduce the population filter and see who performed or approved the real task.

    Send the index and access instructions to the assessor. Keep sensitive files in the approved evidence store.

    Assessed maturity resultsSpreadsheet

    Gather first

    • Baseline evidence
    • Approved target or success definition
    • Dates, denominator and responsible service

    How to prepare it

    1. Pick a measure or outcome with a clear definition. Record the population, reporting period and evidence source so others can calculate it.
    2. Record the current state, target and gap. Add the change needed, accountable owner and next date to collect evidence.
    3. Check the numbers against source data and explain material exceptions or changes in scope before sharing.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Outcome
    Administrators receive quarterly access review.
    Current and evidence
    11 of 12 eligible roles reviewed, IAM export as of 30 Sep 2026.
    Target
    All eligible roles reviewed
    Gap and action
    One role missed. Reconcile new roles before next review.
    Owner and review
    IAM lead, next quarter

    Check before handing it over

    The baseline and target use comparable scope. A reviewer can find the denominator and supporting records.

    Use approved gaps to prioritize the roadmap and refresh the baseline after the next review.

  3. 03

    Remediate by exposure and feasibility

    Who Engineering + system owners When Based on risk and policy

    Prioritize critical gaps and dependencies. Test changes and retain evidence of rollout and exceptions.

    What to produce

    Prioritized backlogSpreadsheet

    Gather first

    • Finding, risk or test exception
    • Root-cause analysis
    • Named owner, due date and expected evidence

    How to prepare it

    1. Record the observation and link the exact test or requirement. Describe the business effect and investigate why the issue was able to happen.
    2. Separate immediate containment from the permanent fix. Give each action an owner, date, verification method and any required approval for deferral.
    3. Retest against the original failure once the fix is live. Record who accepted the outcome and keep unresolved issues visible.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Finding or risk
    F-008, a departed contractor retained production access
    Cause and effect
    HR event never reached IAM. Admin access remained active.
    Action and owner
    Revoke access and alert on failed HR sync. IAM lead.
    Due and status
    2026-11-28, in progress
    Closure test
    Simulate departure and verify access disappears within policy
    Approver and evidence
    Risk owner, ticket IAM-114 and retest results

    Check before handing it over

    The closure test addresses the original problem and has a dated result from an independent reviewer where required.

    Send open items and decisions to governance, audit or the assessor on the applicable cadence.

    Exception decisionsMemo

    Gather first

    • Agenda or decision request
    • Current performance measures and findings
    • Proposed actions and participants

    How to prepare it

    1. Write what decision is needed and list the reports or records the decision maker reviewed. Capture the date, people and decision authority.
    2. Record the decision, alternatives considered, any remaining risk and exactly who will do what by when.
    3. Send notes for factual review. File the approved record and add actions to the working tracker so progress reaches the next review.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Item
    Approve a fix for the missing access-removal retry.
    Inputs reviewed
    September test results and IAM incident root-cause notes.
    Decision
    Approve automatic retry plus daily reconciliation.
    Action and due date
    Platform lead to ship and test by 2026-11-28.
    Residual risk and follow-up
    Manual review remains until rollout. Check at December meeting.

    Check before handing it over

    The minutes identify the person who approved each action and the date the decision will be revisited.

    Give owners the actions and add the approved record to the relevant audit or governance file.

    Rollout evidenceSpreadsheet

    Gather first

    • Control descriptions and test request
    • Source system records
    • Defined period and evidence access rules

    How to prepare it

    1. Create a register keyed by control, requirement or request. Export native records with the filters, timestamps and operator details needed to interpret them.
    2. Link to a restricted copy of each artifact. Note time zone, scope, date range, export method and whether the evidence shows design or actual operation.
    3. Test the links using the reviewer’s permissions. Flag missing periods or evidence and track a follow-up instead of filling in records retrospectively.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Evidence ID
    EV-021
    Control or request
    AC-04, October administrator review
    Period and scope
    1 to 31 Oct 2026 UTC, production tenant
    Source and capture
    IAM export filtered to active elevated roles
    Link or record ID
    Restricted workpaper EV-021 plus ticket IAM-114
    Reviewer and status
    Security assurance, verified

    Check before handing it over

    A reviewer can open the right file, reproduce the population filter and see who performed or approved the real task.

    Send the index and access instructions to the assessor. Keep sensitive files in the approved evidence store.

  4. 04

    Validate and report improvements

    Who Assessor + leadership When At follow-up and policy cadence

    Retest implemented changes, document residual gaps and schedule repeat reviews when the environment changes.

    What to produce

    Follow-up reportMemo

    Gather first

    • Approved test scope and criteria
    • Population and sample records
    • Test approach, results and reviewer requirements

    How to prepare it

    1. State objective, dates, scope and the method before describing results. Record the tester, any independence requirements, and how samples were selected.
    2. For each item, compare what should have happened with what the evidence shows. Describe impact and link the evidence or recorded exception.
    3. Add limitations, obtain review and give each finding an owner and a date. Retain the underlying samples and calculations with the signed version.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Test objective
    Check that production role removals happen within the internal deadline.
    Method and population
    All September departures. Test each privileged account.
    Expected result
    Remove access within one business day.
    Observed result
    11 on time. One late by two days, ticket IAM-114.
    Finding and follow-up
    F-008. Retest the next departure and verify alerting.

    Check before handing it over

    Someone who did not run the test can reproduce the result and tell a finding from a scope limitation.

    Give management the findings and evidence links. Share observations with an external reviewer where the engagement calls for it.

    Maturity roadmapSpreadsheet

    Gather first

    • Baseline evidence
    • Approved target or success definition
    • Dates, denominator and responsible service

    How to prepare it

    1. Pick a measure or outcome with a clear definition. Record the population, reporting period and evidence source so others can calculate it.
    2. Record the current state, target and gap. Add the change needed, accountable owner and next date to collect evidence.
    3. Check the numbers against source data and explain material exceptions or changes in scope before sharing.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Outcome
    Administrators receive quarterly access review.
    Current and evidence
    11 of 12 eligible roles reviewed, IAM export as of 30 Sep 2026.
    Target
    All eligible roles reviewed
    Gap and action
    One role missed. Reconcile new roles before next review.
    Owner and review
    IAM lead, next quarter

    Check before handing it over

    The baseline and target use comparable scope. A reviewer can find the denominator and supporting records.

    Use approved gaps to prioritize the roadmap and refresh the baseline after the next review.

PRIMARY REFERENCES

Official sources

How we build these guides

Keyboard shortcuts

⌘K or /
Search everything
?
This list
g h
Home
g l
Guide library
g f
Find my path
g t
Templates
g p
Playbooks
g w
My workspace
g d
Deadline calendar
g c
Regulatory changes