Start hereDetermine registration and applicable assets
~154 days leftOpen step
Guide library
Industry standard North America

NERC CIP

NERC Critical Infrastructure Protection Reliability Standards

Identify applicable bulk electric system cyber assets and build audit-ready controls.

Who it applies to

Registered entities and qualifying bulk electric system assets under applicable NERC Reliability Standards and jurisdictional rules.

What you’ll produce

Evidence of applicable CIP controls, procedures, testing and reliability compliance.

Applicability depends on function and asset categorization. Use the approved implementation plans and confirm applicability with the relevant regional entity.

TEAM KICKOFF

Run the project

Go to the roadmap

Decisions for leadership

Who accepts proof, and what do they expect?
Check the customer, contract or industry program for the standard version, scope, evidence or validation format and due date. Reserve testing and remediation time.
Who will do the work and who can sign?
Appoint a sponsor, a day-to-day lead and a named owner for every workstream. Set aside their time and decide who can approve the outcome, accept remaining risk or authorize a filing.
Which deadlines can we promise?
Separate fixed external dates from internal targets. Confirm dependencies such as a vendor, test lab or assessor, and approve a backup plan if their dates slip.

How to spend the first week

  1. Ask the first-step owner to bring the most recent system, activity or product inventory and the contract or rule driving the work.
  2. Map one in-scope service or transaction, including providers and supporting systems. Check real evidence against the requirements and confirm whose responsibility each check is.
  3. Record what the sponsor approved, open questions, work owners and the next date a decision is needed. Send the brief to everyone who needs to contribute evidence.

What to review each week

Monitor validation gaps, expired provider evidence and service changes that affect compliance.

Kickoff brief to share with your team

Fill this in with your sponsor and send it to the people who own the work.

NERC CIP kickoff brief
Business reason and required outcome  [Contract, obligation or approval]
Scope and exclusions  [Entities, systems or activities, and reasons]
Fixed deadlines and internal milestones  [Date, source and owner]
Executive sponsor and authorized signer  [Names]
Project lead and backup  [Names]
First workstream  Determine registration and applicable assets · Reliability compliance + operations [Name and due date]
People, effort and external costs  [Estimate, owner and contingency]
Evidence folder and reviewer access  [Location, access owner and review date]
Decisions and blockers  [Item, options, owner and decision date]

First week
1. Ask the first-step owner to bring the most recent system, activity or product inventory and the contract or rule driving the work.
2. Map one in-scope service or transaction, including providers and supporting systems. Check real evidence against the requirements and confirm whose responsibility each check is.
3. Record what the sponsor approved, open questions, work owners and the next date a decision is needed. Send the brief to everyone who needs to contribute evidence.
How to hand off evidence
  1. Record the requirement or claim, the person responsible, the period and the result. Link to the original report, configuration, test or case record.
  2. Include the version, system or product, date, and how you gathered the record. When a report covers a group of items, retain its filters and reconcile the count to the source.
  3. Ask the reviewer to open the evidence and reproduce the key check. Record their decision and date. Keep missing items or failures visible with an owner, a due date and a retest when needed.
  4. Share through the agreed channel. Keep sensitive originals in a restricted location and link any redacted copies to the corresponding originals.
The whole journeyabout 154 days across 4 steps
  1. 01Determine registration and applicable assetsReliability compliance + operations · ~28 days
  2. 02Translate requirements into control workCIP lead + engineering · ~56 days
  3. 03Collect records and test readinessControl owners + compliance team · ~42 days
  4. 04Support monitoring and manage remediationReliability compliance + management · ~28 days
IMPLEMENTATION ROADMAP

Step by step

Checklist, instructions and 10 templates.

View plan as a table
Project roadmap with current target dates and completion status
StepOwnerWhen to actEstimated targetDeliverablesStatus
Determine registration and applicable assetsReliability compliance + operationsBefore selecting requirementsSet a start dateApplicability matrix; BES cyber system inventoryOpen
Translate requirements into control workCIP lead + engineeringBy applicable effective datesSet a start dateControl owners; Procedures; Evidence planOpen
Collect records and test readinessControl owners + compliance teamOn requirement-specific cyclesSet a start dateEvidence package; Exercise records; Findings trackerOpen
Support monitoring and manage remediationReliability compliance + managementOn audit and ongoingSet a start dateMonitoring package; Mitigation and reporting recordsOpen
0 of 4 completeOpen workspace

Targets use illustrative calendar-day estimates and assume the steps run in sequence. Check official dates and agree real durations with your team.

  1. 01

    Determine registration and applicable assets

    Who Reliability compliance + operations When Before selecting requirements

    Identify registered functions and BES facilities. Categorize cyber systems and understand dependencies, impact criteria and jurisdictions.

    What to produce

    Applicability matrixSpreadsheet

    Gather first

    • Official rules or contract and version
    • Product, organization or processing facts
    • Jurisdiction and exception criteria

    How to prepare it

    1. Start with one row per rule, decision or authority. Record the citation, scope test and facts that determine whether it applies.
    2. Distinguish a confirmed decision from an open question. Record the obligation, any exception or approved route, owner and timing.
    3. Have technical and legal or program owners review the decision against the source. Revisit on a new market, product change or rule update.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Requirement or decision
    REG-05, determine whether the new processing activity requires an assessment.
    Source and trigger
    Current regulator guidance, high-risk processing indicators
    Facts and evidence
    New dataset includes sensitive attributes. Data map P-024.
    Outcome and rationale
    Assessment required before release. Privacy lead to confirm scope.
    Owner and review
    Product privacy owner, reassess before launch and on new purposes.

    Check before handing it over

    A reviewer can reach the same decision using the source and facts, or see exactly what remains unresolved.

    Send confirmed obligations to the delivery team and record any unresolved decision with the appropriate authority or specialist.

    BES cyber system inventorySpreadsheet

    Gather first

    • Asset exports or system discovery
    • Service owner interviews
    • Approved scope and architecture

    How to prepare it

    1. Export a dated baseline from the source system. Give each asset, service or record class a stable ID and remove duplicates without losing links to the source.
    2. Add ownership, purpose, sensitivity and any vendor or system it depends on. Mark unknowns explicitly and assign them to someone to resolve.
    3. Reconcile the register against an independent source such as cloud billing or the production deployment list. Set a refresh cadence and an owner.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    ID
    SYS-014
    Item
    Production billing database
    Owner
    Platform operations
    Location and purpose
    Production EU region, stores invoice and account data
    Impact and dependencies
    High. Identity provider and managed backups.
    Verified on
    2026-11-10, cloud inventory export

    Check before handing it over

    Each item has one accountable owner. The source and as-of date let a reviewer trace it back.

    Share the reviewed inventory with the people building the control, privacy or testing scope.

  2. 02

    Translate requirements into control work

    Who CIP lead + engineering When By applicable effective dates

    Assign requirements for electronic and physical access, training, incident response, supply chain and configuration change according to asset scope.

    What to produce

    Control ownersMemo

    Gather first

    • Named roles, on-call contacts and authority
    • Realistic use cases and deadlines
    • Service and vendor dependencies

    How to prepare it

    1. Start with the event or decision and identify who acts first, who has approval authority and who covers absences.
    2. Write the sequence of handoffs and the information each recipient needs. Name the channel, timing and escalation if no one responds.
    3. Rehearse a case and record what broke. Fix missing contacts, duplicate ownership or gaps before approving the playbook or role map.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Event or activity
    Unusual activity detected in support export portal
    First action and owner
    On-call engineer opens a restricted incident case and preserves logs.
    Decision owner and backup
    Privacy lead or legal duty contact will determine reporting.
    Handoff and clock
    Send incident ID, UTC timestamp and known scope immediately.
    Validation
    Exercise completed and backup contact reached.

    Check before handing it over

    Every decision has one accountable person, a backup and a practical route to reach them.

    Share the approved instructions with the people expected to follow them and test the handoffs at the next exercise.

    ProceduresMemo

    Gather first

    • Named roles, on-call contacts and authority
    • Realistic use cases and deadlines
    • Service and vendor dependencies

    How to prepare it

    1. Start with the event or decision and identify who acts first, who has approval authority and who covers absences.
    2. Write the sequence of handoffs and the information each recipient needs. Name the channel, timing and escalation if no one responds.
    3. Rehearse a case and record what broke. Fix missing contacts, duplicate ownership or gaps before approving the playbook or role map.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Event or activity
    Unusual activity detected in support export portal
    First action and owner
    On-call engineer opens a restricted incident case and preserves logs.
    Decision owner and backup
    Privacy lead or legal duty contact will determine reporting.
    Handoff and clock
    Send incident ID, UTC timestamp and known scope immediately.
    Validation
    Exercise completed and backup contact reached.

    Check before handing it over

    Every decision has one accountable person, a backup and a practical route to reach them.

    Share the approved instructions with the people expected to follow them and test the handoffs at the next exercise.

    Evidence planSpreadsheet

    Gather first

    • Control descriptions and test request
    • Source system records
    • Defined period and evidence access rules

    How to prepare it

    1. Create a register keyed by control, requirement or request. Export native records with the filters, timestamps and operator details needed to interpret them.
    2. Link to a restricted copy of each artifact. Note time zone, scope, date range, export method and whether the evidence shows design or actual operation.
    3. Test the links using the reviewer’s permissions. Flag missing periods or evidence and track a follow-up instead of filling in records retrospectively.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Evidence ID
    EV-021
    Control or request
    AC-04, October administrator review
    Period and scope
    1 to 31 Oct 2026 UTC, production tenant
    Source and capture
    IAM export filtered to active elevated roles
    Link or record ID
    Restricted workpaper EV-021 plus ticket IAM-114
    Reviewer and status
    Security assurance, verified

    Check before handing it over

    A reviewer can open the right file, reproduce the population filter and see who performed or approved the real task.

    Send the index and access instructions to the assessor. Keep sensitive files in the approved evidence store.

  3. 03

    Collect records and test readiness

    Who Control owners + compliance team When On requirement-specific cycles

    Capture access, configuration, monitoring and recovery evidence. Exercise incident response and align reporting and testing with applicable versions.

    What to produce

    Evidence packageSpreadsheet

    Gather first

    • Control descriptions and test request
    • Source system records
    • Defined period and evidence access rules

    How to prepare it

    1. Create a register keyed by control, requirement or request. Export native records with the filters, timestamps and operator details needed to interpret them.
    2. Link to a restricted copy of each artifact. Note time zone, scope, date range, export method and whether the evidence shows design or actual operation.
    3. Test the links using the reviewer’s permissions. Flag missing periods or evidence and track a follow-up instead of filling in records retrospectively.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Evidence ID
    EV-021
    Control or request
    AC-04, October administrator review
    Period and scope
    1 to 31 Oct 2026 UTC, production tenant
    Source and capture
    IAM export filtered to active elevated roles
    Link or record ID
    Restricted workpaper EV-021 plus ticket IAM-114
    Reviewer and status
    Security assurance, verified

    Check before handing it over

    A reviewer can open the right file, reproduce the population filter and see who performed or approved the real task.

    Send the index and access instructions to the assessor. Keep sensitive files in the approved evidence store.

    Exercise recordsMemo

    Gather first

    • Approved scenario and participant roles
    • Goals and scoring criteria
    • Event timeline and expected records

    How to prepare it

    1. Prepare a scenario and timed new information that tests decisions, handoffs and evidence. Assign a facilitator and separate observer.
    2. During the exercise, note what participants actually did, the timestamps and where expected responses failed. Distinguish simulated actions from real ones.
    3. Write a short after-action summary with owners, deadlines and a retest plan. Attach the scenario, attendance and evidence references.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Scenario
    Simulated export leak found at 09:20 UTC
    Objective
    Reach operational and legal leads and classify the incident within the exercise target.
    Observed behavior
    Engineering preserved logs. Initial escalation went to an inactive mailbox.
    Action and owner
    Privacy operations updates the routing list before 2026-12-01.
    Retest
    Repeat the handoff in the next on-call drill.

    Check before handing it over

    An absent participant can see what was tested, what happened and why an action was assigned.

    Send approved findings to action owners and file the record for governance or assessment.

    Findings trackerSpreadsheet

    Gather first

    • Finding, risk or test exception
    • Root-cause analysis
    • Named owner, due date and expected evidence

    How to prepare it

    1. Record the observation and link the exact test or requirement. Describe the business effect and investigate why the issue was able to happen.
    2. Separate immediate containment from the permanent fix. Give each action an owner, date, verification method and any required approval for deferral.
    3. Retest against the original failure once the fix is live. Record who accepted the outcome and keep unresolved issues visible.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Finding or risk
    F-008, a departed contractor retained production access
    Cause and effect
    HR event never reached IAM. Admin access remained active.
    Action and owner
    Revoke access and alert on failed HR sync. IAM lead.
    Due and status
    2026-11-28, in progress
    Closure test
    Simulate departure and verify access disappears within policy
    Approver and evidence
    Risk owner, ticket IAM-114 and retest results

    Check before handing it over

    The closure test addresses the original problem and has a dated result from an independent reviewer where required.

    Send open items and decisions to governance, audit or the assessor on the applicable cadence.

  4. 04

    Support monitoring and manage remediation

    Who Reliability compliance + management When On audit and ongoing

    Review regional monitoring requests, support evidence submission and track findings, self-reports and mitigation plans where applicable.

    What to produce

    Monitoring packageMemo

    Gather first

    • Current authority instructions or package list
    • Approved source records and evidence
    • Submission owner and intended review route

    How to prepare it

    1. Download the current instructions and confirm the required format and version. Create an index that maps every required document or answer to a file and owner.
    2. Cross-check names, version numbers and scope across the package. Check file size, required signatures, redactions and all attachment references against the actual portal requirements.
    3. Have a second person run a completeness check. Save a read-only copy of the submitted version, receipt, and follow-up owner.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Package section
    Evidence and supporting technical records
    Requirement and source
    Authority package checklist, current release
    Artifact and version
    Test report TR-017 v2, approved
    Responsible person
    Submission coordinator with technical reviewer
    Submission and receipt
    Record the official filing ID and date after upload

    Check before handing it over

    The submitted package can be recreated from the index and the receipt is linked to the exact files.

    Send the approved package through the official channel. Treat the download as an index, and use issuer forms where required.

    Mitigation and reporting recordsSpreadsheet

    Gather first

    • Finding, risk or test exception
    • Root-cause analysis
    • Named owner, due date and expected evidence

    How to prepare it

    1. Record the observation and link the exact test or requirement. Describe the business effect and investigate why the issue was able to happen.
    2. Separate immediate containment from the permanent fix. Give each action an owner, date, verification method and any required approval for deferral.
    3. Retest against the original failure once the fix is live. Record who accepted the outcome and keep unresolved issues visible.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Finding or risk
    F-008, a departed contractor retained production access
    Cause and effect
    HR event never reached IAM. Admin access remained active.
    Action and owner
    Revoke access and alert on failed HR sync. IAM lead.
    Due and status
    2026-11-28, in progress
    Closure test
    Simulate departure and verify access disappears within policy
    Approver and evidence
    Risk owner, ticket IAM-114 and retest results

    Check before handing it over

    The closure test addresses the original problem and has a dated result from an independent reviewer where required.

    Send open items and decisions to governance, audit or the assessor on the applicable cadence.

PRIMARY REFERENCES

Official sources

How we build these guides

Keyboard shortcuts

⌘K or /
Search everything
?
This list
g h
Home
g l
Guide library
g f
Find my path
g t
Templates
g p
Playbooks
g w
My workspace
g d
Deadline calendar
g c
Regulatory changes