Start hereSet target level, version and boundary
~77 days leftOpen step
Guide library
Framework Global

OWASP ASVS

Application Security Verification Standard

Give developers, testers and buyers a shared checklist for application security.

Who it applies to

Application teams and buyers defining measurable technical security requirements for web applications and services.

What you’ll produce

A versioned requirements-to-test matrix with evidence and owned remediation.

Choose the target level and version explicitly. Tie each requirement to tests that cover your application rather than relying only on automated scanner output.

TEAM KICKOFF

Run the project

Go to the roadmap

Decisions for leadership

Which risks will we reduce and how will we measure it?
Set a target for each priority service or outcome. Use a current baseline to decide the investment needed, what can be phased in, and who accepts remaining risk.
Who will do the work and who can sign?
Appoint a sponsor, a day-to-day lead and a named owner for every workstream. Set aside their time and decide who can approve the outcome, accept remaining risk or authorize a filing.
Which deadlines can we promise?
Separate fixed external dates from internal targets. Confirm dependencies such as a vendor, test lab or assessor, and approve a backup plan if their dates slip.

How to spend the first week

  1. Ask the first-step owner to bring the most recent system, activity or product inventory and the contract or rule driving the work.
  2. Select one service and test a high-impact control with its owner. Record what actually happened, what failed and the proposed target.
  3. Record what the sponsor approved, open questions, work owners and the next date a decision is needed. Send the brief to everyone who needs to contribute evidence.

What to review each week

Monitor progress against the target, failed control tests and gaps that leave a critical service exposed.

Kickoff brief to share with your team

Fill this in with your sponsor and send it to the people who own the work.

OWASP ASVS kickoff brief
Business reason and required outcome  [Contract, obligation or approval]
Scope and exclusions  [Entities, systems or activities, and reasons]
Fixed deadlines and internal milestones  [Date, source and owner]
Executive sponsor and authorized signer  [Names]
Project lead and backup  [Names]
First workstream  Set target level, version and boundary · Application security + product owners [Name and due date]
People, effort and external costs  [Estimate, owner and contingency]
Evidence folder and reviewer access  [Location, access owner and review date]
Decisions and blockers  [Item, options, owner and decision date]

First week
1. Ask the first-step owner to bring the most recent system, activity or product inventory and the contract or rule driving the work.
2. Select one service and test a high-impact control with its owner. Record what actually happened, what failed and the proposed target.
3. Record what the sponsor approved, open questions, work owners and the next date a decision is needed. Send the brief to everyone who needs to contribute evidence.
How to hand off evidence
  1. Record the requirement or claim, the person responsible, the period and the result. Link to the original report, configuration, test or case record.
  2. Include the version, system or product, date, and how you gathered the record. When a report covers a group of items, retain its filters and reconcile the count to the source.
  3. Ask the reviewer to open the evidence and reproduce the key check. Record their decision and date. Keep missing items or failures visible with an owner, a due date and a retest when needed.
  4. Share through the agreed channel. Keep sensitive originals in a restricted location and link any redacted copies to the corresponding originals.
BEFORE YOU START

How this works in practice

Two questions to check scope

  • What loss would an authentication, authorization or data protection failure cause in your application?
  • Can reviewers reproduce how you verified each selected requirement?

Worked scenario

A billing portal moves invoice downloads behind a new API. Testers attempt to fetch an invoice using another account’s identifier, record the negative test and open a defect when the service checks login but misses object ownership.

What to read next

  • EU Cyber Resilience Act

    Check product-level legal duties where the application forms part of a covered product.

  • SOC 2

    Preserve relevant development and remediation evidence for assurance work.

The whole journeyabout 77 days across 4 steps
  1. 01Set target level, version and boundaryApplication security + product owners · ~14 days
  2. 02Write tests against selected requirementsDevelopers + security testers · ~28 days
  3. 03Record observations and verify fixesSecurity tester + engineering · ~21 days
  4. 04Keep requirements in the delivery processEngineering lead + product security · ~14 days
IMPLEMENTATION ROADMAP

Step by step

Checklist, instructions and 8 templates.

View plan as a table
Project roadmap with current target dates and completion status
StepOwnerWhen to actEstimated targetDeliverablesStatus
Set target level, version and boundaryApplication security + product ownersAt design and major changeSet a start dateScope memo; System inventoryOpen
Write tests against selected requirementsDevelopers + security testersBefore the target releaseSet a start dateControl matrix; Testing matrixOpen
Record observations and verify fixesSecurity tester + engineeringDuring release testingSet a start dateTest workpapers; Remediation trackerOpen
Keep requirements in the delivery processEngineering lead + product securityOn every relevant releaseSet a start dateChange log; Evidence planOpen
0 of 4 completeOpen workspace

Targets use illustrative calendar-day estimates and assume the steps run in sequence. Check official dates and agree real durations with your team.

  1. 01

    Set target level, version and boundary

    Who Application security + product owners When At design and major change

    Record entry points, sensitive workflows, tech stack and target assurance level. Pin published requirement identifiers for the version in use.

    What to produce

    Scope memoMemo

    Gather first

    • Service inventory and architecture
    • Customer commitments and contracts
    • Applicable criteria or legal text

    How to prepare it

    1. Write the exact decision this memo supports. Name the legal entity, service, environments and dates. Attach a boundary diagram and state which people, vendors and processes can affect the scope.
    2. List the exclusions next to the inclusion list. Give a reason for each one and describe any shared service that crosses the boundary.
    3. Review the draft with service owners and the person making the decision. Freeze the approved version and add a review date or trigger for changes.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Decision
    Cover the hosted billing service for the April to June review.
    In scope
    Production billing API, hosting, releases and production access.
    Excluded and why
    Internal HR tool. It has no access to billing systems or data.
    Dependencies
    Cloud hosting and corporate identity provider.
    Approval
    Service owner approves after checking the architecture and contract.

    Check before handing it over

    A reviewer can use the memo to classify a named system and see how shared dependencies are handled.

    Give the approved scope and any open questions to whoever will map requirements, select samples or review the engagement.

    System inventorySpreadsheet

    Gather first

    • Asset exports or system discovery
    • Service owner interviews
    • Approved scope and architecture

    How to prepare it

    1. Export a dated baseline from the source system. Give each asset, service or record class a stable ID and remove duplicates without losing links to the source.
    2. Add ownership, purpose, sensitivity and any vendor or system it depends on. Mark unknowns explicitly and assign them to someone to resolve.
    3. Reconcile the register against an independent source such as cloud billing or the production deployment list. Set a refresh cadence and an owner.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    ID
    SYS-014
    Item
    Production billing database
    Owner
    Platform operations
    Location and purpose
    Production EU region, stores invoice and account data
    Impact and dependencies
    High. Identity provider and managed backups.
    Verified on
    2026-11-10, cloud inventory export

    Check before handing it over

    Each item has one accountable owner. The source and as-of date let a reviewer trace it back.

    Share the reviewed inventory with the people building the control, privacy or testing scope.

  2. 02

    Write tests against selected requirements

    Who Developers + security testers When Before the target release

    Map each applicable requirement to design evidence, manual tests or automated checks. Document exclusions and include abuse cases and role boundaries.

    What to produce

    Control matrixSpreadsheet

    Gather first

    • Applicable criteria, requirements or risk decisions
    • Current procedures and configurations
    • Names of people operating or reviewing each control

    How to prepare it

    1. Give each requirement and implemented control an ID. Write a short control statement naming who does what, when and in which system.
    2. Record the evidence the control produces and how it could be tested. For a shared or inherited control, state who owns each part.
    3. Walk through one control with its operator. Check a real recent run, record gaps and obtain approval for exclusions or alternate controls.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Requirement
    Production access is reviewed periodically.
    Control ID
    AC-04
    Control activity
    IAM team exports administrator roles every quarter. System owners approve or revoke each assignment.
    Owner and frequency
    IAM lead, quarterly
    Evidence
    Export with filters, annotated review and removal tickets
    Test and status
    Reconcile export to current roles. Inspect approvals. Operating.

    Check before handing it over

    A different person can operate the control or test it using the matrix and its evidence links.

    Give the baseline to control owners and the assessor before walkthroughs or sampling.

    Testing matrixSpreadsheet

    Gather first

    • Product claims and risk file
    • Applicable standards, study design and acceptance evidence
    • Design configuration and test facilities

    How to prepare it

    1. Trace each claim and risk control to a test objective and acceptance criterion. Specify units, sample rationale, version and worst-case configurations.
    2. Write the method and expected evidence before testing. Assign approvals and record protocol deviations and their effects.
    3. Compare results to the criteria. Keep failed cases, raw data and rationale for repeat testing. Link the approved reports back to the requirements.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Requirement or claim
    Battery alert appears before the device can no longer capture readings.
    Protocol and design
    TR-014, test the production hardware and locked firmware at worst-case temperature.
    Acceptance criteria
    Use the limits approved in the design input before testing.
    Sample and method
    Record sample sizes, lot IDs, conditions and operator.
    Result and evidence
    Link signed protocol, raw output and approved report.

    Check before handing it over

    Every essential claim and risk control has evidence or a documented justification for the gap.

    Give the approved protocol to the testing team and the traceability matrix to the submission owner.

  3. 03

    Record observations and verify fixes

    Who Security tester + engineering When During release testing

    Keep sanitized inputs, environment and expected and actual results. Prioritize exploitable findings, fix them and run the same test again.

    What to produce

    Test workpapersMemo

    Gather first

    • Approved test scope and criteria
    • Population and sample records
    • Test approach, results and reviewer requirements

    How to prepare it

    1. State objective, dates, scope and the method before describing results. Record the tester, any independence requirements, and how samples were selected.
    2. For each item, compare what should have happened with what the evidence shows. Describe impact and link the evidence or recorded exception.
    3. Add limitations, obtain review and give each finding an owner and a date. Retain the underlying samples and calculations with the signed version.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Test objective
    Check that production role removals happen within the internal deadline.
    Method and population
    All September departures. Test each privileged account.
    Expected result
    Remove access within one business day.
    Observed result
    11 on time. One late by two days, ticket IAM-114.
    Finding and follow-up
    F-008. Retest the next departure and verify alerting.

    Check before handing it over

    Someone who did not run the test can reproduce the result and tell a finding from a scope limitation.

    Give management the findings and evidence links. Share observations with an external reviewer where the engagement calls for it.

    Remediation trackerSpreadsheet

    Gather first

    • Finding, risk or test exception
    • Root-cause analysis
    • Named owner, due date and expected evidence

    How to prepare it

    1. Record the observation and link the exact test or requirement. Describe the business effect and investigate why the issue was able to happen.
    2. Separate immediate containment from the permanent fix. Give each action an owner, date, verification method and any required approval for deferral.
    3. Retest against the original failure once the fix is live. Record who accepted the outcome and keep unresolved issues visible.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Finding or risk
    F-008, a departed contractor retained production access
    Cause and effect
    HR event never reached IAM. Admin access remained active.
    Action and owner
    Revoke access and alert on failed HR sync. IAM lead.
    Due and status
    2026-11-28, in progress
    Closure test
    Simulate departure and verify access disappears within policy
    Approver and evidence
    Risk owner, ticket IAM-114 and retest results

    Check before handing it over

    The closure test addresses the original problem and has a dated result from an independent reviewer where required.

    Send open items and decisions to governance, audit or the assessor on the applicable cadence.

  4. 04

    Keep requirements in the delivery process

    Who Engineering lead + product security When On every relevant release

    Add secure acceptance checks and ownership to the development workflow. Update tests and the baseline when the ASVS edition or system architecture changes.

    What to produce

    Change logSpreadsheet

    Gather first

    • Case, change or communication records
    • Required fields and timing
    • Named case owner and authorized recipients

    How to prepare it

    1. Give each event a record ID. Record the action or request, receipt or send time, owner and the deadline or next date.
    2. Write the decision and link the response or supporting record. Track delivery, escalation or verification separately so a sent message is distinguishable from an accepted one.
    3. Review open rows on a regular cadence. Restrict personal details to the case system and keep the register to IDs and necessary dates.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Record ID
    REQ-022
    Event and date
    Verified access request received 2026-11-07 UTC
    Owner and target
    Privacy operations, internal review by 2026-11-23
    Decision and status
    Approved response, sent securely
    Completion evidence
    Case delivery record, 2026-11-24
    Follow-up
    None, approved by the reviewer

    Check before handing it over

    Every open item has a next action and closed items have a verifiable record of closure or delivery.

    Use the log at case reviews and provide a restricted copy only where the engagement requires it.

    Evidence planSpreadsheet

    Gather first

    • Control descriptions and test request
    • Source system records
    • Defined period and evidence access rules

    How to prepare it

    1. Create a register keyed by control, requirement or request. Export native records with the filters, timestamps and operator details needed to interpret them.
    2. Link to a restricted copy of each artifact. Note time zone, scope, date range, export method and whether the evidence shows design or actual operation.
    3. Test the links using the reviewer’s permissions. Flag missing periods or evidence and track a follow-up instead of filling in records retrospectively.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Evidence ID
    EV-021
    Control or request
    AC-04, October administrator review
    Period and scope
    1 to 31 Oct 2026 UTC, production tenant
    Source and capture
    IAM export filtered to active elevated roles
    Link or record ID
    Restricted workpaper EV-021 plus ticket IAM-114
    Reviewer and status
    Security assurance, verified

    Check before handing it over

    A reviewer can open the right file, reproduce the population filter and see who performed or approved the real task.

    Send the index and access instructions to the assessor. Keep sensitive files in the approved evidence store.

PRIMARY REFERENCES

Official sources

How we build these guides

Keyboard shortcuts

⌘K or /
Search everything
?
This list
g h
Home
g l
Guide library
g f
Find my path
g t
Templates
g p
Playbooks
g w
My workspace
g d
Deadline calendar
g c
Regulatory changes