APRA CPS 234

Prudential Standard CPS 234 Information Security

Classify information assets, test their controls and prepare independent assurance and APRA notifications.

Who it applies to

Entities within CPS 234’s applicability, including relevant APRA-regulated financial institutions and assets managed by third parties.

What you’ll produce

Demonstrable information security capability, control testing, internal assurance and incident escalation.

Outsourced assets can remain in scope. A provider’s attestation alone may leave gaps in testing coverage for your specific assets and obligations.

TEAM KICKOFF

Run the project

Go to the roadmap

Decisions for leadership

What applies to each entity, product and activity?
Have Legal or Regulatory confirm scope and applicable deadlines for each entity, activity and jurisdiction. Assign owners for incident reporting, filings and lifecycle changes where required.
Who will do the work and who can sign?
Appoint a sponsor, a day-to-day lead and a named owner for every workstream. Set aside their time and decide who can approve the outcome, accept remaining risk or authorize a filing.
Which deadlines can we promise?
Separate fixed external dates from internal targets. Confirm dependencies such as a vendor, test lab or assessor, and approve a backup plan if their dates slip.

How to spend the first week

  1. Ask the first-step owner to bring the most recent system, activity or product inventory and the contract or rule driving the work.
  2. Walk a real activity through the systems, suppliers and teams that run it. Verify the rule, authority and deadline that apply to the observed facts.
  3. Record what the sponsor approved, open questions, work owners and the next date a decision is needed. Send the brief to everyone who needs to contribute evidence.

What to review each week

Monitor obligations without a named owner, filings or notifications approaching deadline, and changes that should reopen the scope decision.

Kickoff brief to share with your team

Fill this in with your sponsor and send it to the people who own the work.

APRA CPS 234 kickoff brief
Business reason and required outcome  [Contract, obligation or approval]
Scope and exclusions  [Entities, systems or activities, and reasons]
Fixed deadlines and internal milestones  [Date, source and owner]
Executive sponsor and authorized signer  [Names]
Project lead and backup  [Names]
First workstream  Assign oversight and classify information assets · Board + security lead [Name and due date]
People, effort and external costs  [Estimate, owner and contingency]
Evidence folder and reviewer access  [Location, access owner and review date]
Decisions and blockers  [Item, options, owner and decision date]

First week
1. Ask the first-step owner to bring the most recent system, activity or product inventory and the contract or rule driving the work.
2. Walk a real activity through the systems, suppliers and teams that run it. Verify the rule, authority and deadline that apply to the observed facts.
3. Record what the sponsor approved, open questions, work owners and the next date a decision is needed. Send the brief to everyone who needs to contribute evidence.
How to hand off evidence
  1. Record the requirement or claim, the person responsible, the period and the result. Link to the original report, configuration, test or case record.
  2. Include the version, system or product, date, and how you gathered the record. When a report covers a group of items, retain its filters and reconcile the count to the source.
  3. Ask the reviewer to open the evidence and reproduce the key check. Record their decision and date. Keep missing items or failures visible with an owner, a due date and a retest when needed.
  4. Share through the agreed channel. Keep sensitive originals in a restricted location and link any redacted copies to the corresponding originals.
BEFORE YOU START

How this works in practice

Two questions to check scope

  • Which information assets are critical or sensitive, including those held by third parties?
  • Who independently tests the controls and who decides if a weakness is material?

Worked scenario

An Australian insurer relies on an external claims platform. It classifies the data and dependencies, checks which provider controls its test report covers, and obtains separate evidence for integration controls the provider did not test.

What to read next

  • APRA CPS 230

    Map critical operations, tolerance levels and material service providers alongside the security work.

  • Essential Eight

    Use a technical baseline to help plan and test controls.

DATES AND TRIGGERS

Official milestones

See the deadline calendar
  • No later than 72 hours after awareness

    Notify APRA of a qualifying information security incident

    Apply CPS 234’s material impact or other-regulator notification criteria and notify as soon as possible.

    Official reference (opens in a new tab)
The whole journeyabout 84 days across 4 steps
  1. 01Assign oversight and classify information assetsBoard + security lead · ~14 days
  2. 02Build capability and test controlsSecurity engineering + assurance · ~35 days
  3. 03Assess weaknesses and assurance coverageInternal audit + security leadership · ~21 days
  4. 04Prepare and test the reporting decisionIncident lead + compliance · ~14 days
IMPLEMENTATION ROADMAP

Step by step

Checklist, instructions and 11 templates.

View plan as a table
Project roadmap with current target dates and completion status
StepOwnerWhen to actEstimated targetDeliverablesStatus
Assign oversight and classify information assetsBoard + security leadBefore scoping control workSet a start dateScope memo; Critical-function inventory; Responsibility matrixOpen
Build capability and test controlsSecurity engineering + assuranceOn a planned, risk-based scheduleSet a start dateControl matrix; Testing program; Test reportsOpen
Assess weaknesses and assurance coverageInternal audit + security leadershipAt findings and audit reviewsSet a start dateCorrective-action register; Internal audit reportOpen
Prepare and test the reporting decisionIncident lead + complianceAs soon as possible at a qualifying incidentSet a start dateIncident assessment; Notification record; Exercise reportOpen
0 of 4 completeOpen workspace

Targets use illustrative calendar-day estimates and assume the steps run in sequence. Check official dates and agree real durations with your team.

  1. 01

    Assign oversight and classify information assets

    Who Board + security lead When Before scoping control work

    Map assets and who manages them. Assess criticality and sensitivity, including third parties, and allocate security roles and escalation.

    What to produce

    Scope memoMemo

    Gather first

    • Service inventory and architecture
    • Customer commitments and contracts
    • Applicable criteria or legal text

    How to prepare it

    1. Write the exact decision this memo supports. Name the legal entity, service, environments and dates. Attach a boundary diagram and state which people, vendors and processes can affect the scope.
    2. List the exclusions next to the inclusion list. Give a reason for each one and describe any shared service that crosses the boundary.
    3. Review the draft with service owners and the person making the decision. Freeze the approved version and add a review date or trigger for changes.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Decision
    Cover the hosted billing service for the April to June review.
    In scope
    Production billing API, hosting, releases and production access.
    Excluded and why
    Internal HR tool. It has no access to billing systems or data.
    Dependencies
    Cloud hosting and corporate identity provider.
    Approval
    Service owner approves after checking the architecture and contract.

    Check before handing it over

    A reviewer can use the memo to classify a named system and see how shared dependencies are handled.

    Give the approved scope and any open questions to whoever will map requirements, select samples or review the engagement.

    Critical-function inventorySpreadsheet

    Gather first

    • Asset exports or system discovery
    • Service owner interviews
    • Approved scope and architecture

    How to prepare it

    1. Export a dated baseline from the source system. Give each asset, service or record class a stable ID and remove duplicates without losing links to the source.
    2. Add ownership, purpose, sensitivity and any vendor or system it depends on. Mark unknowns explicitly and assign them to someone to resolve.
    3. Reconcile the register against an independent source such as cloud billing or the production deployment list. Set a refresh cadence and an owner.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    ID
    SYS-014
    Item
    Production billing database
    Owner
    Platform operations
    Location and purpose
    Production EU region, stores invoice and account data
    Impact and dependencies
    High. Identity provider and managed backups.
    Verified on
    2026-11-10, cloud inventory export

    Check before handing it over

    Each item has one accountable owner. The source and as-of date let a reviewer trace it back.

    Share the reviewed inventory with the people building the control, privacy or testing scope.

    Responsibility matrixMemo

    Gather first

    • Named roles, on-call contacts and authority
    • Realistic use cases and deadlines
    • Service and vendor dependencies

    How to prepare it

    1. Start with the event or decision and identify who acts first, who has approval authority and who covers absences.
    2. Write the sequence of handoffs and the information each recipient needs. Name the channel, timing and escalation if no one responds.
    3. Rehearse a case and record what broke. Fix missing contacts, duplicate ownership or gaps before approving the playbook or role map.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Event or activity
    Unusual activity detected in support export portal
    First action and owner
    On-call engineer opens a restricted incident case and preserves logs.
    Decision owner and backup
    Privacy lead or legal duty contact will determine reporting.
    Handoff and clock
    Send incident ID, UTC timestamp and known scope immediately.
    Validation
    Exercise completed and backup contact reached.

    Check before handing it over

    Every decision has one accountable person, a backup and a practical route to reach them.

    Share the approved instructions with the people expected to follow them and test the handoffs at the next exercise.

  2. 02

    Build capability and test controls

    Who Security engineering + assurance When On a planned, risk-based schedule

    Map policies and controls to assets and exposures. Verify tester competence and independence, and evaluate controls run by external parties.

    What to produce

    Control matrixSpreadsheet

    Gather first

    • Applicable criteria, requirements or risk decisions
    • Current procedures and configurations
    • Names of people operating or reviewing each control

    How to prepare it

    1. Give each requirement and implemented control an ID. Write a short control statement naming who does what, when and in which system.
    2. Record the evidence the control produces and how it could be tested. For a shared or inherited control, state who owns each part.
    3. Walk through one control with its operator. Check a real recent run, record gaps and obtain approval for exclusions or alternate controls.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Requirement
    Production access is reviewed periodically.
    Control ID
    AC-04
    Control activity
    IAM team exports administrator roles every quarter. System owners approve or revoke each assignment.
    Owner and frequency
    IAM lead, quarterly
    Evidence
    Export with filters, annotated review and removal tickets
    Test and status
    Reconcile export to current roles. Inspect approvals. Operating.

    Check before handing it over

    A different person can operate the control or test it using the matrix and its evidence links.

    Give the baseline to control owners and the assessor before walkthroughs or sampling.

    Testing programMemo

    Gather first

    • Approved scope
    • Governing requirements and risks
    • Teams, service dependencies and review gates

    How to prepare it

    1. State the objective, scope, accountable owner and conditions that trigger action. Translate commitments into tasks with periods, thresholds and evidence.
    2. For each task set the input, decision rule, output and handoff. Include escalation for failures and approvals for exceptions.
    3. Walk through one real case with owners and reviewers. Approve the version, schedule review, and check that promised tasks have operational records.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Purpose
    Identify failed production backup jobs and restore service data.
    Scope
    Production billing databases and backup vault
    Activity and timing
    On-call reviews daily job alerts and runs a quarterly restore test.
    Evidence and exception
    Keep job records and restore test output. Page the service owner if a job fails.
    Owner and approval
    Operations lead owns. Service owner approves.

    Check before handing it over

    A person who receives the plan can tell when to act, what to check and where to save the result.

    Give the approved plan to the people responsible for operation. Add dated checkpoints to the working calendar.

    Test reportsMemo

    Gather first

    • Approved test scope and criteria
    • Population and sample records
    • Test approach, results and reviewer requirements

    How to prepare it

    1. State objective, dates, scope and the method before describing results. Record the tester, any independence requirements, and how samples were selected.
    2. For each item, compare what should have happened with what the evidence shows. Describe impact and link the evidence or recorded exception.
    3. Add limitations, obtain review and give each finding an owner and a date. Retain the underlying samples and calculations with the signed version.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Test objective
    Check that production role removals happen within the internal deadline.
    Method and population
    All September departures. Test each privileged account.
    Expected result
    Remove access within one business day.
    Observed result
    11 on time. One late by two days, ticket IAM-114.
    Finding and follow-up
    F-008. Retest the next departure and verify alerting.

    Check before handing it over

    Someone who did not run the test can reproduce the result and tell a finding from a scope limitation.

    Give management the findings and evidence links. Share observations with an external reviewer where the engagement calls for it.

  3. 03

    Assess weaknesses and assurance coverage

    Who Internal audit + security leadership When At findings and audit reviews

    Assess materiality, track remediation timing and investigate gaps in assurance. Determine whether a material weakness needs APRA notification under the standard.

    What to produce

    Corrective-action registerSpreadsheet

    Gather first

    • Finding, risk or test exception
    • Root-cause analysis
    • Named owner, due date and expected evidence

    How to prepare it

    1. Record the observation and link the exact test or requirement. Describe the business effect and investigate why the issue was able to happen.
    2. Separate immediate containment from the permanent fix. Give each action an owner, date, verification method and any required approval for deferral.
    3. Retest against the original failure once the fix is live. Record who accepted the outcome and keep unresolved issues visible.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Finding or risk
    F-008, a departed contractor retained production access
    Cause and effect
    HR event never reached IAM. Admin access remained active.
    Action and owner
    Revoke access and alert on failed HR sync. IAM lead.
    Due and status
    2026-11-28, in progress
    Closure test
    Simulate departure and verify access disappears within policy
    Approver and evidence
    Risk owner, ticket IAM-114 and retest results

    Check before handing it over

    The closure test addresses the original problem and has a dated result from an independent reviewer where required.

    Send open items and decisions to governance, audit or the assessor on the applicable cadence.

    Internal audit reportMemo

    Gather first

    • Approved test scope and criteria
    • Population and sample records
    • Test approach, results and reviewer requirements

    How to prepare it

    1. State objective, dates, scope and the method before describing results. Record the tester, any independence requirements, and how samples were selected.
    2. For each item, compare what should have happened with what the evidence shows. Describe impact and link the evidence or recorded exception.
    3. Add limitations, obtain review and give each finding an owner and a date. Retain the underlying samples and calculations with the signed version.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Test objective
    Check that production role removals happen within the internal deadline.
    Method and population
    All September departures. Test each privileged account.
    Expected result
    Remove access within one business day.
    Observed result
    11 on time. One late by two days, ticket IAM-114.
    Finding and follow-up
    F-008. Retest the next departure and verify alerting.

    Check before handing it over

    Someone who did not run the test can reproduce the result and tell a finding from a scope limitation.

    Give management the findings and evidence links. Share observations with an external reviewer where the engagement calls for it.

  4. 04

    Prepare and test the reporting decision

    Who Incident lead + compliance When As soon as possible at a qualifying incident

    Apply the standard’s impact and regulator-notification criteria. Record awareness time and preserve the APRA notice and subsequent updates.

    What to produce

    Incident assessmentSpreadsheet

    Gather first

    • Alert or breach report
    • Investigation facts and relevant thresholds
    • Escalation contacts and official reporting clocks

    How to prepare it

    1. Start a case with UTC timestamps for detection, awareness, assessment and containment. Keep known facts separate from estimates and update both as evidence changes.
    2. Identify affected systems, people, data and likely harms. Link your classification, notice decision and the rule that starts each clock.
    3. Record containment, preservation, escalation and notification actions. Capture who approved the decision and set a time to confirm outstanding facts.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Incident ID
    INC-041
    Awareness and facts
    2026-11-13 09:20 UTC. Export link exposed to an unauthorized account.
    Scope and uncertainty
    One confirmed access. Log review for further recipients in progress.
    Decision and reason
    Privacy lead to assess reporting threshold with counsel by 10:30 UTC.
    Actions and status
    Access revoked, logs preserved, next review at 12:00 UTC.

    Check before handing it over

    Timelines distinguish different events and a reviewer can reconstruct the reporting decision from the available facts.

    Give the incident lead and privacy decision maker a time-stamped update. Preserve working evidence separately.

    Notification recordSpreadsheet

    Gather first

    • Case, change or communication records
    • Required fields and timing
    • Named case owner and authorized recipients

    How to prepare it

    1. Give each event a record ID. Record the action or request, receipt or send time, owner and the deadline or next date.
    2. Write the decision and link the response or supporting record. Track delivery, escalation or verification separately so a sent message is distinguishable from an accepted one.
    3. Review open rows on a regular cadence. Restrict personal details to the case system and keep the register to IDs and necessary dates.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Record ID
    REQ-022
    Event and date
    Verified access request received 2026-11-07 UTC
    Owner and target
    Privacy operations, internal review by 2026-11-23
    Decision and status
    Approved response, sent securely
    Completion evidence
    Case delivery record, 2026-11-24
    Follow-up
    None, approved by the reviewer

    Check before handing it over

    Every open item has a next action and closed items have a verifiable record of closure or delivery.

    Use the log at case reviews and provide a restricted copy only where the engagement requires it.

    Exercise reportMemo

    Gather first

    • Approved scenario and participant roles
    • Goals and scoring criteria
    • Event timeline and expected records

    How to prepare it

    1. Prepare a scenario and timed new information that tests decisions, handoffs and evidence. Assign a facilitator and separate observer.
    2. During the exercise, note what participants actually did, the timestamps and where expected responses failed. Distinguish simulated actions from real ones.
    3. Write a short after-action summary with owners, deadlines and a retest plan. Attach the scenario, attendance and evidence references.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Scenario
    Simulated export leak found at 09:20 UTC
    Objective
    Reach operational and legal leads and classify the incident within the exercise target.
    Observed behavior
    Engineering preserved logs. Initial escalation went to an inactive mailbox.
    Action and owner
    Privacy operations updates the routing list before 2026-12-01.
    Retest
    Repeat the handoff in the next on-call drill.

    Check before handing it over

    An absent participant can see what was tested, what happened and why an action was assigned.

    Send approved findings to action owners and file the record for governance or assessment.

PRIMARY REFERENCES

Official sources

How we build these guides

Keyboard shortcuts

⌘K or /
Search everything
?
This list
g h
Home
g l
Guide library
g f
Find my path
g t
Templates
g p
Playbooks
g w
My workspace
g d
Deadline calendar
g c
Regulatory changes