Start hereDefine the QMS scope and market requirements
~126 days leftOpen step
Guide library
Certification Global

ISO 13485

ISO 13485:2016 quality management systems for medical devices

Build a medical-device quality system around design, supplier control, production and post-market feedback.

Who it applies to

Organizations involved in relevant stages of the medical-device lifecycle and suppliers operating under the applicable quality requirements.

What you’ll produce

A documented quality management system and, when pursued and awarded, a certificate for its audited scope.

An ISO 13485 QMS can support market entry. Use each market’s legal requirements for clearance, licensing, inspection and post-market duties.

TEAM KICKOFF

Run the project

Go to the roadmap

Decisions for leadership

What do we need the certification to cover?
Confirm the applicable edition, sites, products or service boundary and the certification route. Budget for assessment, changes needed to pass, and maintaining certification.
Who will do the work and who can sign?
Appoint a sponsor, a day-to-day lead and a named owner for every workstream. Set aside their time and decide who can approve the outcome, accept remaining risk or authorize a filing.
Which deadlines can we promise?
Separate fixed external dates from internal targets. Confirm dependencies such as a vendor, test lab or assessor, and approve a backup plan if their dates slip.

How to spend the first week

  1. Ask the first-step owner to bring the most recent system, activity or product inventory and the contract or rule driving the work.
  2. Ask the appropriate assessor or program contact what scope they will review, what evidence they need, and which dates and fees they can confirm in writing.
  3. Record what the sponsor approved, open questions, work owners and the next date a decision is needed. Send the brief to everyone who needs to contribute evidence.

What to review each week

Monitor unresolved scope questions, controls without evidence, findings that need a retest and the next assessment or renewal date.

Kickoff brief to share with your team

Fill this in with your sponsor and send it to the people who own the work.

ISO 13485 kickoff brief
Business reason and required outcome  [Contract, obligation or approval]
Scope and exclusions  [Entities, systems or activities, and reasons]
Fixed deadlines and internal milestones  [Date, source and owner]
Executive sponsor and authorized signer  [Names]
Project lead and backup  [Names]
First workstream  Define the QMS scope and market requirements · Quality lead + regulatory affairs [Name and due date]
People, effort and external costs  [Estimate, owner and contingency]
Evidence folder and reviewer access  [Location, access owner and review date]
Decisions and blockers  [Item, options, owner and decision date]

First week
1. Ask the first-step owner to bring the most recent system, activity or product inventory and the contract or rule driving the work.
2. Ask the appropriate assessor or program contact what scope they will review, what evidence they need, and which dates and fees they can confirm in writing.
3. Record what the sponsor approved, open questions, work owners and the next date a decision is needed. Send the brief to everyone who needs to contribute evidence.
How to hand off evidence
  1. Record the requirement or claim, the person responsible, the period and the result. Link to the original report, configuration, test or case record.
  2. Include the version, system or product, date, and how you gathered the record. When a report covers a group of items, retain its filters and reconcile the count to the source.
  3. Ask the reviewer to open the evidence and reproduce the key check. Record their decision and date. Keep missing items or failures visible with an owner, a due date and a retest when needed.
  4. Share through the agreed channel. Keep sensitive originals in a restricted location and link any redacted copies to the corresponding originals.
BEFORE YOU START

How this works in practice

Two questions to check scope

  • Which legal manufacturers, product families, sites and outsourced processes fall in the proposed QMS scope?
  • Which markets require a particular audit program or additional quality controls?

Worked scenario

A device company outsources assembly but keeps design and complaints in-house. The quality lead puts those handoffs on the process map and tracks how supplier changes reach design, production and post-market teams.

What to read next

The whole journeyabout 126 days across 4 steps
  1. 01Define the QMS scope and market requirementsQuality lead + regulatory affairs · ~21 days
  2. 02Trace design, purchasing and production controlsDesign assurance + supplier quality · ~42 days
  3. 03Run feedback and corrective actionPost-market lead + quality · ~28 days
  4. 04Audit the system and resolve findingsInternal audit + certification body as applicable · ~35 days
IMPLEMENTATION ROADMAP

Step by step

Checklist, instructions and 11 templates.

View plan as a table
Project roadmap with current target dates and completion status
StepOwnerWhen to actEstimated targetDeliverablesStatus
Define the QMS scope and market requirementsQuality lead + regulatory affairsBefore changing proceduresSet a start dateScope statement; Obligations registerOpen
Trace design, purchasing and production controlsDesign assurance + supplier qualityBefore routine productionSet a start dateRisk file; Control matrix; QMS recordsOpen
Run feedback and corrective actionPost-market lead + qualityOngoingSet a start dateVigilance logs; CAPA log; Management review minutesOpen
Audit the system and resolve findingsInternal audit + certification body as applicableBefore an external audit and at follow-upSet a start dateInternal audit report; Corrective-action register; Certification decisionOpen
0 of 4 completeOpen workspace

Targets use illustrative calendar-day estimates and assume the steps run in sequence. Check official dates and agree real durations with your team.

  1. 01

    Define the QMS scope and market requirements

    Who Quality lead + regulatory affairs When Before changing procedures

    Identify devices, sites, roles and outsourced activities. Map applicable regulatory requirements and review any justified exclusion or non-applicability.

    What to produce

    Scope statementMemo

    Gather first

    • Service inventory and architecture
    • Customer commitments and contracts
    • Applicable criteria or legal text

    How to prepare it

    1. Write the exact decision this memo supports. Name the legal entity, service, environments and dates. Attach a boundary diagram and state which people, vendors and processes can affect the scope.
    2. List the exclusions next to the inclusion list. Give a reason for each one and describe any shared service that crosses the boundary.
    3. Review the draft with service owners and the person making the decision. Freeze the approved version and add a review date or trigger for changes.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Decision
    Cover the hosted billing service for the April to June review.
    In scope
    Production billing API, hosting, releases and production access.
    Excluded and why
    Internal HR tool. It has no access to billing systems or data.
    Dependencies
    Cloud hosting and corporate identity provider.
    Approval
    Service owner approves after checking the architecture and contract.

    Check before handing it over

    A reviewer can use the memo to classify a named system and see how shared dependencies are handled.

    Give the approved scope and any open questions to whoever will map requirements, select samples or review the engagement.

    Obligations registerSpreadsheet

    Gather first

    • Official rules or contract and version
    • Product, organization or processing facts
    • Jurisdiction and exception criteria

    How to prepare it

    1. Start with one row per rule, decision or authority. Record the citation, scope test and facts that determine whether it applies.
    2. Distinguish a confirmed decision from an open question. Record the obligation, any exception or approved route, owner and timing.
    3. Have technical and legal or program owners review the decision against the source. Revisit on a new market, product change or rule update.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Requirement or decision
    REG-05, determine whether the new processing activity requires an assessment.
    Source and trigger
    Current regulator guidance, high-risk processing indicators
    Facts and evidence
    New dataset includes sensitive attributes. Data map P-024.
    Outcome and rationale
    Assessment required before release. Privacy lead to confirm scope.
    Owner and review
    Product privacy owner, reassess before launch and on new purposes.

    Check before handing it over

    A reviewer can reach the same decision using the source and facts, or see exactly what remains unresolved.

    Send confirmed obligations to the delivery team and record any unresolved decision with the appropriate authority or specialist.

  2. 02

    Trace design, purchasing and production controls

    Who Design assurance + supplier quality When Before routine production

    Connect user needs, risk controls, verification and design changes. Assign supplier qualification and record validation of processes where required.

    What to produce

    Risk fileSpreadsheet

    Gather first

    • Intended use, use environment and product architecture
    • Hazards, complaints and design inputs
    • Approved risk method and verification evidence

    How to prepare it

    1. Describe the sequence from hazard through hazardous situation to possible harm. Apply the approved risk criteria and record the original and residual risk.
    2. Select controls in the required order. Trace each control to design requirements and verification, while considering new risks introduced by the control.
    3. Obtain the required risk decisions and update the file from complaints, field data and substantial design changes.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Hazard sequence
    Battery depletion interrupts capture during home use.
    Possible harm
    A needed reading is unavailable to the user.
    Control and requirement
    Show an early low-charge warning and preserve the last completed reading.
    Verification evidence
    TR-014 worst-case battery testing and UI review
    Residual risk and action
    Record decision under the approved risk method. Monitor postmarket reports.

    Check before handing it over

    Each control traces to a test or review and residual risk is resolved through the documented approval route.

    Give the approved file to quality, product engineering and the submission or conformity lead.

    Control matrixSpreadsheet

    Gather first

    • Applicable criteria, requirements or risk decisions
    • Current procedures and configurations
    • Names of people operating or reviewing each control

    How to prepare it

    1. Give each requirement and implemented control an ID. Write a short control statement naming who does what, when and in which system.
    2. Record the evidence the control produces and how it could be tested. For a shared or inherited control, state who owns each part.
    3. Walk through one control with its operator. Check a real recent run, record gaps and obtain approval for exclusions or alternate controls.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Requirement
    Production access is reviewed periodically.
    Control ID
    AC-04
    Control activity
    IAM team exports administrator roles every quarter. System owners approve or revoke each assignment.
    Owner and frequency
    IAM lead, quarterly
    Evidence
    Export with filters, annotated review and removal tickets
    Test and status
    Reconcile export to current roles. Inspect approvals. Operating.

    Check before handing it over

    A different person can operate the control or test it using the matrix and its evidence links.

    Give the baseline to control owners and the assessor before walkthroughs or sampling.

    QMS recordsMemo

    Gather first

    • Current authority instructions or package list
    • Approved source records and evidence
    • Submission owner and intended review route

    How to prepare it

    1. Download the current instructions and confirm the required format and version. Create an index that maps every required document or answer to a file and owner.
    2. Cross-check names, version numbers and scope across the package. Check file size, required signatures, redactions and all attachment references against the actual portal requirements.
    3. Have a second person run a completeness check. Save a read-only copy of the submitted version, receipt, and follow-up owner.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Package section
    Evidence and supporting technical records
    Requirement and source
    Authority package checklist, current release
    Artifact and version
    Test report TR-017 v2, approved
    Responsible person
    Submission coordinator with technical reviewer
    Submission and receipt
    Record the official filing ID and date after upload

    Check before handing it over

    The submitted package can be recreated from the index and the receipt is linked to the exact files.

    Send the approved package through the official channel. Treat the download as an index, and use issuer forms where required.

  3. 03

    Run feedback and corrective action

    Who Post-market lead + quality When Ongoing

    Route complaints to investigation, vigilance and risk review where appropriate. Verify CAPA effectiveness and use trend data at management review.

    What to produce

    Vigilance logsSpreadsheet

    Gather first

    • Alert or breach report
    • Investigation facts and relevant thresholds
    • Escalation contacts and official reporting clocks

    How to prepare it

    1. Start a case with UTC timestamps for detection, awareness, assessment and containment. Keep known facts separate from estimates and update both as evidence changes.
    2. Identify affected systems, people, data and likely harms. Link your classification, notice decision and the rule that starts each clock.
    3. Record containment, preservation, escalation and notification actions. Capture who approved the decision and set a time to confirm outstanding facts.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Incident ID
    INC-041
    Awareness and facts
    2026-11-13 09:20 UTC. Export link exposed to an unauthorized account.
    Scope and uncertainty
    One confirmed access. Log review for further recipients in progress.
    Decision and reason
    Privacy lead to assess reporting threshold with counsel by 10:30 UTC.
    Actions and status
    Access revoked, logs preserved, next review at 12:00 UTC.

    Check before handing it over

    Timelines distinguish different events and a reviewer can reconstruct the reporting decision from the available facts.

    Give the incident lead and privacy decision maker a time-stamped update. Preserve working evidence separately.

    CAPA logSpreadsheet

    Gather first

    • Finding, risk or test exception
    • Root-cause analysis
    • Named owner, due date and expected evidence

    How to prepare it

    1. Record the observation and link the exact test or requirement. Describe the business effect and investigate why the issue was able to happen.
    2. Separate immediate containment from the permanent fix. Give each action an owner, date, verification method and any required approval for deferral.
    3. Retest against the original failure once the fix is live. Record who accepted the outcome and keep unresolved issues visible.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Finding or risk
    F-008, a departed contractor retained production access
    Cause and effect
    HR event never reached IAM. Admin access remained active.
    Action and owner
    Revoke access and alert on failed HR sync. IAM lead.
    Due and status
    2026-11-28, in progress
    Closure test
    Simulate departure and verify access disappears within policy
    Approver and evidence
    Risk owner, ticket IAM-114 and retest results

    Check before handing it over

    The closure test addresses the original problem and has a dated result from an independent reviewer where required.

    Send open items and decisions to governance, audit or the assessor on the applicable cadence.

    Management review minutesMemo

    Gather first

    • Agenda or decision request
    • Current performance measures and findings
    • Proposed actions and participants

    How to prepare it

    1. Write what decision is needed and list the reports or records the decision maker reviewed. Capture the date, people and decision authority.
    2. Record the decision, alternatives considered, any remaining risk and exactly who will do what by when.
    3. Send notes for factual review. File the approved record and add actions to the working tracker so progress reaches the next review.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Item
    Approve a fix for the missing access-removal retry.
    Inputs reviewed
    September test results and IAM incident root-cause notes.
    Decision
    Approve automatic retry plus daily reconciliation.
    Action and due date
    Platform lead to ship and test by 2026-11-28.
    Residual risk and follow-up
    Manual review remains until rollout. Check at December meeting.

    Check before handing it over

    The minutes identify the person who approved each action and the date the decision will be revisited.

    Give owners the actions and add the approved record to the relevant audit or governance file.

  4. 04

    Audit the system and resolve findings

    Who Internal audit + certification body as applicable When Before an external audit and at follow-up

    Sample operating records, prepare independent internal audits and schedule assessments for the right site and product scope. Track corrective actions to closure.

    What to produce

    Internal audit reportMemo

    Gather first

    • Approved test scope and criteria
    • Population and sample records
    • Test approach, results and reviewer requirements

    How to prepare it

    1. State objective, dates, scope and the method before describing results. Record the tester, any independence requirements, and how samples were selected.
    2. For each item, compare what should have happened with what the evidence shows. Describe impact and link the evidence or recorded exception.
    3. Add limitations, obtain review and give each finding an owner and a date. Retain the underlying samples and calculations with the signed version.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Test objective
    Check that production role removals happen within the internal deadline.
    Method and population
    All September departures. Test each privileged account.
    Expected result
    Remove access within one business day.
    Observed result
    11 on time. One late by two days, ticket IAM-114.
    Finding and follow-up
    F-008. Retest the next departure and verify alerting.

    Check before handing it over

    Someone who did not run the test can reproduce the result and tell a finding from a scope limitation.

    Give management the findings and evidence links. Share observations with an external reviewer where the engagement calls for it.

    Corrective-action registerSpreadsheet

    Gather first

    • Finding, risk or test exception
    • Root-cause analysis
    • Named owner, due date and expected evidence

    How to prepare it

    1. Record the observation and link the exact test or requirement. Describe the business effect and investigate why the issue was able to happen.
    2. Separate immediate containment from the permanent fix. Give each action an owner, date, verification method and any required approval for deferral.
    3. Retest against the original failure once the fix is live. Record who accepted the outcome and keep unresolved issues visible.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Finding or risk
    F-008, a departed contractor retained production access
    Cause and effect
    HR event never reached IAM. Admin access remained active.
    Action and owner
    Revoke access and alert on failed HR sync. IAM lead.
    Due and status
    2026-11-28, in progress
    Closure test
    Simulate departure and verify access disappears within policy
    Approver and evidence
    Risk owner, ticket IAM-114 and retest results

    Check before handing it over

    The closure test addresses the original problem and has a dated result from an independent reviewer where required.

    Send open items and decisions to governance, audit or the assessor on the applicable cadence.

    Certification decisionIssuer document

    Gather first

    • Correct portal or issuer contact
    • Approved scope and submission record
    • File access and sharing requirements

    How to prepare it

    1. Confirm which issuer or portal supplies this record and who can retrieve it. Gather the submission reference, holder name, scope and expected date.
    2. When the document arrives, verify recipient, scope, dates, version, conditions and any required verification link. Escalate discrepancies to the issuer.
    3. Save the original in the approved location. Record renewal or response actions and limit distribution to authorized recipients.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Document expected
    Issuer’s final decision or confirmation
    Reference
    Official portal or case ID
    Received and verified by
    Compliance coordinator, 2026-11-10
    Scope and conditions
    Matches the agreed service boundary and version. Follow-up recorded separately.
    Location and access
    Restricted evidence folder, named reviewers only

    Check before handing it over

    The original can be traced to the issuer and its scope and date match the engagement or application.

    Send the verified record or approved summary to decision makers. The download is a tracking sheet for the original document.

PRIMARY REFERENCES

Official sources

How we build these guides

Keyboard shortcuts

⌘K or /
Search everything
?
This list
g h
Home
g l
Guide library
g f
Find my path
g t
Templates
g p
Playbooks
g w
My workspace
g d
Deadline calendar
g c
Regulatory changes