TRUST ATLAS WORKSHEET

Risk file

ISO 13485 · Step 2 · Trace design, purchasing and production controls
Who prepares it
Design assurance + supplier quality
When to prepare it
Before routine production

Worked example

This example uses fictional details. Use the same fields with evidence from your work.

Hazard sequence
Battery depletion interrupts capture during home use.
Possible harm
A needed reading is unavailable to the user.
Control and requirement
Show an early low-charge warning and preserve the last completed reading.
Verification evidence
TR-014 worst-case battery testing and UI review
Residual risk and action
Record decision under the approved risk method. Monitor postmarket reports.

Gather first

  • Intended use, use environment and product architecture
  • Hazards, complaints and design inputs
  • Approved risk method and verification evidence

How to prepare it

  1. Describe the sequence from hazard through hazardous situation to possible harm. Apply the approved risk criteria and record the original and residual risk.
  2. Select controls in the required order. Trace each control to design requirements and verification, while considering new risks introduced by the control.
  3. Obtain the required risk decisions and update the file from complaints, field data and substantial design changes.

Review

Each control traces to a test or review and residual risk is resolved through the documented approval route.

Handoff

Give the approved file to quality, product engineering and the submission or conformity lead.

Keyboard shortcuts

⌘K or /
Search everything
?
This list
g h
Home
g l
Guide library
g f
Find my path
g t
Templates
g p
Playbooks
g w
My workspace
g d
Deadline calendar
g c
Regulatory changes