TRUST ATLAS WORKSHEET
Risk file
ISO 13485 · Step 2 · Trace design, purchasing and production controls- Who prepares it
- Design assurance + supplier quality
- When to prepare it
- Before routine production
Worked example
This example uses fictional details. Use the same fields with evidence from your work.
- Hazard sequence
- Battery depletion interrupts capture during home use.
- Possible harm
- A needed reading is unavailable to the user.
- Control and requirement
- Show an early low-charge warning and preserve the last completed reading.
- Verification evidence
- TR-014 worst-case battery testing and UI review
- Residual risk and action
- Record decision under the approved risk method. Monitor postmarket reports.
Gather first
- Intended use, use environment and product architecture
- Hazards, complaints and design inputs
- Approved risk method and verification evidence
How to prepare it
- Describe the sequence from hazard through hazardous situation to possible harm. Apply the approved risk criteria and record the original and residual risk.
- Select controls in the required order. Trace each control to design requirements and verification, while considering new risks introduced by the control.
- Obtain the required risk decisions and update the file from complaints, field data and substantial design changes.
Review
Each control traces to a test or review and residual risk is resolved through the documented approval route.
Handoff
Give the approved file to quality, product engineering and the submission or conformity lead.