OSFI Guideline B-13

Technology and Cyber Risk Management for federally regulated financial institutions

Translate Canadian supervisory expectations into accountable technology and cyber operations.

Who it applies to

Canadian federally regulated financial institutions to which the guideline and related supervisory publications apply.

What you’ll produce

Technology and cyber risk governance, resilient operations and a tested supervisory reporting process.

Treat B-13, third-party risk expectations and the incident reporting advisory as related work with separately mapped criteria and deliverables.

TEAM KICKOFF

Run the project

Go to the roadmap

Decisions for leadership

Which risks will we reduce and how will we measure it?
Set a target for each priority service or outcome. Use a current baseline to decide the investment needed, what can be phased in, and who accepts remaining risk.
Who will do the work and who can sign?
Appoint a sponsor, a day-to-day lead and a named owner for every workstream. Set aside their time and decide who can approve the outcome, accept remaining risk or authorize a filing.
Which deadlines can we promise?
Separate fixed external dates from internal targets. Confirm dependencies such as a vendor, test lab or assessor, and approve a backup plan if their dates slip.

How to spend the first week

  1. Ask the first-step owner to bring the most recent system, activity or product inventory and the contract or rule driving the work.
  2. Select one service and test a high-impact control with its owner. Record what actually happened, what failed and the proposed target.
  3. Record what the sponsor approved, open questions, work owners and the next date a decision is needed. Send the brief to everyone who needs to contribute evidence.

What to review each week

Monitor progress against the target, failed control tests and gaps that leave a critical service exposed.

Kickoff brief to share with your team

Fill this in with your sponsor and send it to the people who own the work.

OSFI Guideline B-13 kickoff brief
Business reason and required outcome  [Contract, obligation or approval]
Scope and exclusions  [Entities, systems or activities, and reasons]
Fixed deadlines and internal milestones  [Date, source and owner]
Executive sponsor and authorized signer  [Names]
Project lead and backup  [Names]
First workstream  Map technology and cyber governance · Senior management + risk lead [Name and due date]
People, effort and external costs  [Estimate, owner and contingency]
Evidence folder and reviewer access  [Location, access owner and review date]
Decisions and blockers  [Item, options, owner and decision date]

First week
1. Ask the first-step owner to bring the most recent system, activity or product inventory and the contract or rule driving the work.
2. Select one service and test a high-impact control with its owner. Record what actually happened, what failed and the proposed target.
3. Record what the sponsor approved, open questions, work owners and the next date a decision is needed. Send the brief to everyone who needs to contribute evidence.
How to hand off evidence
  1. Record the requirement or claim, the person responsible, the period and the result. Link to the original report, configuration, test or case record.
  2. Include the version, system or product, date, and how you gathered the record. When a report covers a group of items, retain its filters and reconcile the count to the source.
  3. Ask the reviewer to open the evidence and reproduce the key check. Record their decision and date. Keep missing items or failures visible with an owner, a due date and a retest when needed.
  4. Share through the agreed channel. Keep sensitive originals in a restricted location and link any redacted copies to the corresponding originals.
BEFORE YOU START

How this works in practice

Two questions to check scope

  • Which federally regulated entities and critical systems are in the review?
  • Would an outage or suspected breach meet any of OSFI’s reportability criteria before all evidence is known?

Worked scenario

A bank’s identity provider fails. Technology operations records the affected services and actions, while its reporting lead checks the supervisory criteria and contacts both OSFI recipients if the event qualifies.

What to read next

  • DORA

    Compare equivalent operational work and different reporting obligations for an EU financial entity.

  • PIPEDA

    Check privacy breach notifications separately.

DATES AND TRIGGERS

Official milestones

See the deadline calendar
The whole journeyabout 91 days across 4 steps
  1. 01Map technology and cyber governanceSenior management + risk lead · ~21 days
  2. 02Run resilient technology operationsTechnology operations + security · ~35 days
  3. 03Exercise supervisory reportingIncident lead + compliance · ~21 days
  4. 04Review residual issues with managementRisk governance + control owners · ~14 days
IMPLEMENTATION ROADMAP

Step by step

Checklist, instructions and 11 templates.

View plan as a table
Project roadmap with current target dates and completion status
StepOwnerWhen to actEstimated targetDeliverablesStatus
Map technology and cyber governanceSenior management + risk leadAt program initiation and changesSet a start dateICT risk framework; Responsibility matrix; Critical-function inventoryOpen
Run resilient technology operationsTechnology operations + securityOngoingSet a start dateControl matrix; Test reports; Recovery evidenceOpen
Exercise supervisory reportingIncident lead + complianceAt incident and during drillsSet a start dateReporting templates; Exercise report; Notification recordOpen
Review residual issues with managementRisk governance + control ownersRegularly and after material changesSet a start dateCorrective-action register; Management review minutesOpen
0 of 4 completeOpen workspace

Targets use illustrative calendar-day estimates and assume the steps run in sequence. Check official dates and agree real durations with your team.

  1. 01

    Map technology and cyber governance

    Who Senior management + risk lead When At program initiation and changes

    Set oversight, risk tolerance and ownership. Inventory critical technology, external dependencies and the controls supporting them.

    What to produce

    ICT risk frameworkMemo

    Gather first

    • Approved scope
    • Governing requirements and risks
    • Teams, service dependencies and review gates

    How to prepare it

    1. State the objective, scope, accountable owner and conditions that trigger action. Translate commitments into tasks with periods, thresholds and evidence.
    2. For each task set the input, decision rule, output and handoff. Include escalation for failures and approvals for exceptions.
    3. Walk through one real case with owners and reviewers. Approve the version, schedule review, and check that promised tasks have operational records.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Purpose
    Identify failed production backup jobs and restore service data.
    Scope
    Production billing databases and backup vault
    Activity and timing
    On-call reviews daily job alerts and runs a quarterly restore test.
    Evidence and exception
    Keep job records and restore test output. Page the service owner if a job fails.
    Owner and approval
    Operations lead owns. Service owner approves.

    Check before handing it over

    A person who receives the plan can tell when to act, what to check and where to save the result.

    Give the approved plan to the people responsible for operation. Add dated checkpoints to the working calendar.

    Responsibility matrixMemo

    Gather first

    • Named roles, on-call contacts and authority
    • Realistic use cases and deadlines
    • Service and vendor dependencies

    How to prepare it

    1. Start with the event or decision and identify who acts first, who has approval authority and who covers absences.
    2. Write the sequence of handoffs and the information each recipient needs. Name the channel, timing and escalation if no one responds.
    3. Rehearse a case and record what broke. Fix missing contacts, duplicate ownership or gaps before approving the playbook or role map.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Event or activity
    Unusual activity detected in support export portal
    First action and owner
    On-call engineer opens a restricted incident case and preserves logs.
    Decision owner and backup
    Privacy lead or legal duty contact will determine reporting.
    Handoff and clock
    Send incident ID, UTC timestamp and known scope immediately.
    Validation
    Exercise completed and backup contact reached.

    Check before handing it over

    Every decision has one accountable person, a backup and a practical route to reach them.

    Share the approved instructions with the people expected to follow them and test the handoffs at the next exercise.

    Critical-function inventorySpreadsheet

    Gather first

    • Asset exports or system discovery
    • Service owner interviews
    • Approved scope and architecture

    How to prepare it

    1. Export a dated baseline from the source system. Give each asset, service or record class a stable ID and remove duplicates without losing links to the source.
    2. Add ownership, purpose, sensitivity and any vendor or system it depends on. Mark unknowns explicitly and assign them to someone to resolve.
    3. Reconcile the register against an independent source such as cloud billing or the production deployment list. Set a refresh cadence and an owner.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    ID
    SYS-014
    Item
    Production billing database
    Owner
    Platform operations
    Location and purpose
    Production EU region, stores invoice and account data
    Impact and dependencies
    High. Identity provider and managed backups.
    Verified on
    2026-11-10, cloud inventory export

    Check before handing it over

    Each item has one accountable owner. The source and as-of date let a reviewer trace it back.

    Share the reviewed inventory with the people building the control, privacy or testing scope.

  2. 02

    Run resilient technology operations

    Who Technology operations + security When Ongoing

    Review architecture, change practices and asset dependencies. Test patching, access, monitoring, backup and recovery against documented objectives.

    What to produce

    Control matrixSpreadsheet

    Gather first

    • Applicable criteria, requirements or risk decisions
    • Current procedures and configurations
    • Names of people operating or reviewing each control

    How to prepare it

    1. Give each requirement and implemented control an ID. Write a short control statement naming who does what, when and in which system.
    2. Record the evidence the control produces and how it could be tested. For a shared or inherited control, state who owns each part.
    3. Walk through one control with its operator. Check a real recent run, record gaps and obtain approval for exclusions or alternate controls.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Requirement
    Production access is reviewed periodically.
    Control ID
    AC-04
    Control activity
    IAM team exports administrator roles every quarter. System owners approve or revoke each assignment.
    Owner and frequency
    IAM lead, quarterly
    Evidence
    Export with filters, annotated review and removal tickets
    Test and status
    Reconcile export to current roles. Inspect approvals. Operating.

    Check before handing it over

    A different person can operate the control or test it using the matrix and its evidence links.

    Give the baseline to control owners and the assessor before walkthroughs or sampling.

    Test reportsMemo

    Gather first

    • Approved test scope and criteria
    • Population and sample records
    • Test approach, results and reviewer requirements

    How to prepare it

    1. State objective, dates, scope and the method before describing results. Record the tester, any independence requirements, and how samples were selected.
    2. For each item, compare what should have happened with what the evidence shows. Describe impact and link the evidence or recorded exception.
    3. Add limitations, obtain review and give each finding an owner and a date. Retain the underlying samples and calculations with the signed version.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Test objective
    Check that production role removals happen within the internal deadline.
    Method and population
    All September departures. Test each privileged account.
    Expected result
    Remove access within one business day.
    Observed result
    11 on time. One late by two days, ticket IAM-114.
    Finding and follow-up
    F-008. Retest the next departure and verify alerting.

    Check before handing it over

    Someone who did not run the test can reproduce the result and tell a finding from a scope limitation.

    Give management the findings and evidence links. Share observations with an external reviewer where the engagement calls for it.

    Recovery evidenceSpreadsheet

    Gather first

    • Control descriptions and test request
    • Source system records
    • Defined period and evidence access rules

    How to prepare it

    1. Create a register keyed by control, requirement or request. Export native records with the filters, timestamps and operator details needed to interpret them.
    2. Link to a restricted copy of each artifact. Note time zone, scope, date range, export method and whether the evidence shows design or actual operation.
    3. Test the links using the reviewer’s permissions. Flag missing periods or evidence and track a follow-up instead of filling in records retrospectively.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Evidence ID
    EV-021
    Control or request
    AC-04, October administrator review
    Period and scope
    1 to 31 Oct 2026 UTC, production tenant
    Source and capture
    IAM export filtered to active elevated roles
    Link or record ID
    Restricted workpaper EV-021 plus ticket IAM-114
    Reviewer and status
    Security assurance, verified

    Check before handing it over

    A reviewer can open the right file, reproduce the population filter and see who performed or approved the real task.

    Send the index and access instructions to the assessor. Keep sensitive files in the approved evidence store.

  3. 03

    Exercise supervisory reporting

    Who Incident lead + compliance When At incident and during drills

    Apply the advisory criteria. Pre-stage the reporting form and route to the Technology Risk Division and lead supervisor. Track follow-up as facts develop.

    What to produce

    Reporting templatesMemo

    Gather first

    • Incident case facts and awareness timestamps
    • Current authority forms and applicable notification criteria
    • Approved recipients and counsel or incident lead

    How to prepare it

    1. Identify the recipient and required fields. Prepare a concise account of what happened, data and people affected, likely consequences, protective steps and an official contact.
    2. Mark unknown facts and state how they will be updated. Confirm recipients and secure delivery or required portal before sending.
    3. Obtain the prescribed approval. Keep the sent version, delivery receipt and any follow-up or supplement with the case.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Recipient and reference
    Approved authority or affected person, incident INC-041
    What happened
    An account viewed a link beyond its permissions. Investigation continues.
    Likely effect and protection
    Access was revoked. Review your recent account activity and contact support for help.
    Contact and update
    Approved incident contact, updated facts after log review
    Approval and record
    Privacy lead approved, receipt recorded in case file

    Check before handing it over

    Use the applicable authority’s language and official portal where required. Every material factual statement can be traced to the case.

    Have the authorized notifier submit through the official channel and add the receipt and follow-up date to the incident log.

    Exercise reportMemo

    Gather first

    • Approved scenario and participant roles
    • Goals and scoring criteria
    • Event timeline and expected records

    How to prepare it

    1. Prepare a scenario and timed new information that tests decisions, handoffs and evidence. Assign a facilitator and separate observer.
    2. During the exercise, note what participants actually did, the timestamps and where expected responses failed. Distinguish simulated actions from real ones.
    3. Write a short after-action summary with owners, deadlines and a retest plan. Attach the scenario, attendance and evidence references.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Scenario
    Simulated export leak found at 09:20 UTC
    Objective
    Reach operational and legal leads and classify the incident within the exercise target.
    Observed behavior
    Engineering preserved logs. Initial escalation went to an inactive mailbox.
    Action and owner
    Privacy operations updates the routing list before 2026-12-01.
    Retest
    Repeat the handoff in the next on-call drill.

    Check before handing it over

    An absent participant can see what was tested, what happened and why an action was assigned.

    Send approved findings to action owners and file the record for governance or assessment.

    Notification recordSpreadsheet

    Gather first

    • Case, change or communication records
    • Required fields and timing
    • Named case owner and authorized recipients

    How to prepare it

    1. Give each event a record ID. Record the action or request, receipt or send time, owner and the deadline or next date.
    2. Write the decision and link the response or supporting record. Track delivery, escalation or verification separately so a sent message is distinguishable from an accepted one.
    3. Review open rows on a regular cadence. Restrict personal details to the case system and keep the register to IDs and necessary dates.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Record ID
    REQ-022
    Event and date
    Verified access request received 2026-11-07 UTC
    Owner and target
    Privacy operations, internal review by 2026-11-23
    Decision and status
    Approved response, sent securely
    Completion evidence
    Case delivery record, 2026-11-24
    Follow-up
    None, approved by the reviewer

    Check before handing it over

    Every open item has a next action and closed items have a verifiable record of closure or delivery.

    Use the log at case reviews and provide a restricted copy only where the engagement requires it.

  4. 04

    Review residual issues with management

    Who Risk governance + control owners When Regularly and after material changes

    Compare results to risk tolerance, assign remediation and keep accountable leadership informed of material issues and outcomes.

    What to produce

    Corrective-action registerSpreadsheet

    Gather first

    • Finding, risk or test exception
    • Root-cause analysis
    • Named owner, due date and expected evidence

    How to prepare it

    1. Record the observation and link the exact test or requirement. Describe the business effect and investigate why the issue was able to happen.
    2. Separate immediate containment from the permanent fix. Give each action an owner, date, verification method and any required approval for deferral.
    3. Retest against the original failure once the fix is live. Record who accepted the outcome and keep unresolved issues visible.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Finding or risk
    F-008, a departed contractor retained production access
    Cause and effect
    HR event never reached IAM. Admin access remained active.
    Action and owner
    Revoke access and alert on failed HR sync. IAM lead.
    Due and status
    2026-11-28, in progress
    Closure test
    Simulate departure and verify access disappears within policy
    Approver and evidence
    Risk owner, ticket IAM-114 and retest results

    Check before handing it over

    The closure test addresses the original problem and has a dated result from an independent reviewer where required.

    Send open items and decisions to governance, audit or the assessor on the applicable cadence.

    Management review minutesMemo

    Gather first

    • Agenda or decision request
    • Current performance measures and findings
    • Proposed actions and participants

    How to prepare it

    1. Write what decision is needed and list the reports or records the decision maker reviewed. Capture the date, people and decision authority.
    2. Record the decision, alternatives considered, any remaining risk and exactly who will do what by when.
    3. Send notes for factual review. File the approved record and add actions to the working tracker so progress reaches the next review.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Item
    Approve a fix for the missing access-removal retry.
    Inputs reviewed
    September test results and IAM incident root-cause notes.
    Decision
    Approve automatic retry plus daily reconciliation.
    Action and due date
    Platform lead to ship and test by 2026-11-28.
    Residual risk and follow-up
    Manual review remains until rollout. Check at December meeting.

    Check before handing it over

    The minutes identify the person who approved each action and the date the decision will be revisited.

    Give owners the actions and add the approved record to the relevant audit or governance file.

PRIMARY REFERENCES

Official sources

How we build these guides

Keyboard shortcuts

⌘K or /
Search everything
?
This list
g h
Home
g l
Guide library
g f
Find my path
g t
Templates
g p
Playbooks
g w
My workspace
g d
Deadline calendar
g c
Regulatory changes