Template library
TRUST ATLAS WORKSHEET

Control matrix

OSFI Guideline B-13 · Step 2 · Run resilient technology operations
Who prepares it
Technology operations + security
When to prepare it
Ongoing

Spreadsheet columns

Use these column headings. Add one row for each item you record.

  1. Requirement
  2. Control ID
  3. Control activity
  4. Owner and frequency
  5. Evidence
  6. Test and status

Gather first

  • Applicable criteria, requirements or risk decisions
  • Current procedures and configurations
  • Names of people operating or reviewing each control

How to prepare it

  1. Give each requirement and implemented control an ID. Write a short control statement naming who does what, when and in which system.
  2. Record the evidence the control produces and how it could be tested. For a shared or inherited control, state who owns each part.
  3. Walk through one control with its operator. Check a real recent run, record gaps and obtain approval for exclusions or alternate controls.

Review

A different person can operate the control or test it using the matrix and its evidence links.

Handoff

Give the baseline to control owners and the assessor before walkthroughs or sampling.

Keyboard shortcuts

⌘K or /
Search everything
?
This list
g h
Home
g l
Guide library
g f
Find my path
g t
Templates
g p
Playbooks
g w
My workspace
g d
Deadline calendar
g c
Regulatory changes