TRUST ATLAS WORKSHEET
Testing matrix
EU in vitro diagnostics · Step 2 · Plan and generate performance evidence- Who prepares it
- Clinical + analytical performance teams
- When to prepare it
- Before conformity assessment
Worked example
This example uses fictional details. Use the same fields with evidence from your work.
- Requirement or claim
- Battery alert appears before the device can no longer capture readings.
- Protocol and design
- TR-014, test the production hardware and locked firmware at worst-case temperature.
- Acceptance criteria
- Use the limits approved in the design input before testing.
- Sample and method
- Record sample sizes, lot IDs, conditions and operator.
- Result and evidence
- Link signed protocol, raw output and approved report.
Gather first
- Product claims and risk file
- Applicable standards, study design and acceptance evidence
- Design configuration and test facilities
How to prepare it
- Trace each claim and risk control to a test objective and acceptance criterion. Specify units, sample rationale, version and worst-case configurations.
- Write the method and expected evidence before testing. Assign approvals and record protocol deviations and their effects.
- Compare results to the criteria. Keep failed cases, raw data and rationale for repeat testing. Link the approved reports back to the requirements.
Review
Every essential claim and risk control has evidence or a documented justification for the gap.
Handoff
Give the approved protocol to the testing team and the traceability matrix to the submission owner.