Template library
TRUST ATLAS WORKSHEET

Testing matrix

EU in vitro diagnostics · Step 2 · Plan and generate performance evidence
Who prepares it
Clinical + analytical performance teams
When to prepare it
Before conformity assessment

Worked example

This example uses fictional details. Use the same fields with evidence from your work.

Requirement or claim
Battery alert appears before the device can no longer capture readings.
Protocol and design
TR-014, test the production hardware and locked firmware at worst-case temperature.
Acceptance criteria
Use the limits approved in the design input before testing.
Sample and method
Record sample sizes, lot IDs, conditions and operator.
Result and evidence
Link signed protocol, raw output and approved report.

Gather first

  • Product claims and risk file
  • Applicable standards, study design and acceptance evidence
  • Design configuration and test facilities

How to prepare it

  1. Trace each claim and risk control to a test objective and acceptance criterion. Specify units, sample rationale, version and worst-case configurations.
  2. Write the method and expected evidence before testing. Assign approvals and record protocol deviations and their effects.
  3. Compare results to the criteria. Keep failed cases, raw data and rationale for repeat testing. Link the approved reports back to the requirements.

Review

Every essential claim and risk control has evidence or a documented justification for the gap.

Handoff

Give the approved protocol to the testing team and the traceability matrix to the submission owner.

Keyboard shortcuts

⌘K or /
Search everything
?
This list
g h
Home
g l
Guide library
g f
Find my path
g t
Templates
g p
Playbooks
g w
My workspace
g d
Deadline calendar
g c
Regulatory changes