Template library
TRUST ATLAS WORKSHEET

Safety requirements matrix

EU in vitro diagnostics · Step 3 · Build the technical file and complete assessment
Who prepares it
Quality + regulatory affairs
When to prepare it
Before placing covered devices on the market

Worked example

This example uses fictional details. Use the same fields with evidence from your work.

Requirement
Production access is reviewed periodically.
Control ID
AC-04
Control activity
IAM team exports administrator roles every quarter. System owners approve or revoke each assignment.
Owner and frequency
IAM lead, quarterly
Evidence
Export with filters, annotated review and removal tickets
Test and status
Reconcile export to current roles. Inspect approvals. Operating.

Gather first

  • Applicable criteria, requirements or risk decisions
  • Current procedures and configurations
  • Names of people operating or reviewing each control

How to prepare it

  1. Give each requirement and implemented control an ID. Write a short control statement naming who does what, when and in which system.
  2. Record the evidence the control produces and how it could be tested. For a shared or inherited control, state who owns each part.
  3. Walk through one control with its operator. Check a real recent run, record gaps and obtain approval for exclusions or alternate controls.

Review

A different person can operate the control or test it using the matrix and its evidence links.

Handoff

Give the baseline to control owners and the assessor before walkthroughs or sampling.

Keyboard shortcuts

⌘K or /
Search everything
?
This list
g h
Home
g l
Guide library
g f
Find my path
g t
Templates
g p
Playbooks
g w
My workspace
g d
Deadline calendar
g c
Regulatory changes