TRUST ATLAS WORKSHEET
Control matrix
Singapore Cyber Trust mark · Step 2 · Implement measures and gather evidence- Who prepares it
- Controls lead + service owners
- When to prepare it
- Before assessment
Spreadsheet columns
Use these column headings. Add one row for each item you record.
- Requirement
- Control ID
- Control activity
- Owner and frequency
- Evidence
- Test and status
Gather first
- Applicable criteria, requirements or risk decisions
- Current procedures and configurations
- Names of people operating or reviewing each control
How to prepare it
- Give each requirement and implemented control an ID. Write a short control statement naming who does what, when and in which system.
- Record the evidence the control produces and how it could be tested. For a shared or inherited control, state who owns each part.
- Walk through one control with its operator. Check a real recent run, record gaps and obtain approval for exclusions or alternate controls.
Review
A different person can operate the control or test it using the matrix and its evidence links.
Handoff
Give the baseline to control owners and the assessor before walkthroughs or sampling.