COPRSETR WORKSHEET
EESS renewal and change register
Electrical Equipment Safety System (EESS) · Step 4 · Track renewals, changes and safety incidents- Who prepares it
- Product compliance + Quality + Distribution
- When to prepare it
- During supply and before changing a model or component
Spreadsheet columns
Use these column headings. Add one row for each item you record.
- Fictional renewal dates
- Change ticket
- Traceability check
Gather first
- Supplier and equipment register entries
- Certificate and standard dates
- Component change records
- Batch and retailer records
- Level 2 evidence retention schedule
How to prepare it
- Record each supplier, equipment and certificate date in separate fields. Give renewal owners early reminders and verify that the registration term fits the certificate where required.
- Route changes to components, factory, label, trade name or claimed standard to the engineering and regulatory owners. Capture a new sample and obtain an updated report, certificate or registration when required.
- Keep evidence current, including the Level 2 folder for five years after the registration ends. Link safety complaints and incident reports to batches and recipients and give Distribution the process for stopping supply.
Review
A reviewer can see which models were approved at any point, when their evidence expires and who can retrieve it or stop supply.
Handoff
Share next due dates and confirmed changes with the importer, distributors and the team that controls listings.
Use the issuer’s current instructions and any required forms when you submit.
EESS Level 2 evidence and retention requirements (opens in a new tab)