Electrical Equipment Safety System (EESS)

Australia and New Zealand EESS: electrical equipment registration and RCM

Classify household electrical equipment, gather evidence for the exact model, and check supplier registration, equipment registration and labeling before supply.

Issuing authority
Australian electrical safety regulators and WorkSafe New Zealand
Timing
Complete applicable declarations, certification, registration and marking before offering equipment for sale. Renew Responsible Supplier registration annually. Level 2 and 3 registration can run for one, two or five years, subject to the applicable certificate eligibility and expiry constraints.
Reviewed
Inside this guide
4 steps · 8 templates

Who it applies to

Manufacturers, importers and downstream suppliers of in-scope electrical equipment in Australian EESS jurisdictions. Check the voltage and intended use of each product and accessory. Verify New Zealand’s own regulations separately if supplying there or using its EESS recognition route.

What you’ll produce

A documented risk level for each model, the required evidence or certificate, a current supplier and equipment record where required, and a signed pre-sale release check.

The EESS lists Queensland, Victoria, Western Australia and Tasmania as signatories. Check the destination regulator’s requirements for each market, including NSW’s approval rules and New Zealand’s conditions for recognizing particular EESS products and suppliers.

TEAM KICKOFF

Run the project

Go to the roadmap

Decisions for leadership

Which entity is accountable for supply?
Name the first manufacturer or importer for each market and confirm who can make the applicable supplier declarations. Give Sales a market list approved by Regulatory Affairs.
Who can hold a purchase or listing?
Give Quality authority to stop an order if the test model, certificate or registration differs from the shipment. Require a separate approval for changed plugs, cords or brand labels.
Can you identify the affected stock during a recall?
Require lot and model references across your own stores and resellers. Give Distribution access to the release records before an incident.

How to spend the first week

  1. Choose a high-volume model and obtain the actual sale sample, label and supplier report. Reconcile all three before expanding the review to other variants.
  2. Confirm platform access for the Authorised Officer and document which registrations, certificates and class transitions expire first.
  3. Ask a downstream buyer to verify one registration from the data you provide. Check whether the buyer can identify the responsible supplier and exact model.

What to review each week

Report models and markets with approved classifications, effective certificate and registration dates, open evidence gaps, blocked changes and lots that need follow-up.

Kickoff brief to share with your team

Fill this in with your sponsor and send it to the people who own the work.

Electrical Equipment Safety System (EESS) kickoff brief
Business reason and required outcome  [Contract, obligation or approval]
Scope and exclusions  [Entities, systems or activities, and reasons]
Fixed deadlines and internal milestones  [Date, source and owner]
Executive sponsor and authorized signer  [Names]
Project lead and backup  [Names]
First workstream  Classify the model and each market · Product compliance + electrical engineer + local importer [Name and due date]
People, effort and external costs  [Estimate, owner and contingency]
Evidence folder and reviewer access  [Location, access owner and review date]
Decisions and blockers  [Item, options, owner and decision date]

First week
1. Choose a high-volume model and obtain the actual sale sample, label and supplier report. Reconcile all three before expanding the review to other variants.
2. Confirm platform access for the Authorised Officer and document which registrations, certificates and class transitions expire first.
3. Ask a downstream buyer to verify one registration from the data you provide. Check whether the buyer can identify the responsible supplier and exact model.
How to hand off evidence
  1. Record the requirement or claim, the person responsible, the period and the result. Link to the original report, configuration, test or case record.
  2. Include the version, system or product, date, and how you gathered the record. When a report covers a group of items, retain its filters and reconcile the count to the source.
  3. Ask the reviewer to open the evidence and reproduce the key check. Record their decision and date. Keep missing items or failures visible with an owner, a due date and a retest when needed.
  4. Share through the agreed channel. Keep sensitive originals in a restricted location and link any redacted copies to the corresponding originals.
BEFORE YOU START

How this works in practice

Two questions to check scope

  • Who is the registered manufacturer or first importer for this exact model and supply chain?
  • Can you match the final sale unit, plug, cord and label to the tested configuration, certificate and register entry?

Worked scenario

A Victorian importer plans to sell a household bread toaster under two brands. Compliance checks the Level 3 class and applicable standard. Supplier Quality matches both trade names and the exact plug and nameplates to the certificate, and a retailer checks the importer’s active equipment entry before listing the product.

What to read next

  • EU Cyber Resilience Act

    Check separate EU cybersecurity obligations if your electrical product has covered digital elements.

FROM THE SOURCE

Cases and numbers

Official fee schedule · from 1 July 2026

AUD 329.59One supplier year plus one equipment registration year

Supplier and equipment registrations are billed separately

The EESS lists AUD 239.74 per year for the supplier and AUD 89.85 for one year of Level 2 or Level 3 equipment registration. The schedule also lists two-year and five-year equipment terms.

What to check Budget separate lines for the supplier account, equipment and any lab or certification charges. Check how certificate expiry affects the available equipment term.

EESS registration fee schedule (opens in a new tab)

Australian electrical safety recall · 2026

A promotional travel adapter had uninsulated plug pins

Recall PRA2026/21078 covered a Woodside-branded adapter distributed at events. The notice identified missing pin insulation, no earth connection and a lack of certification for Australian use.

What to check Have procurement include promotional giveaways in product safety checks. Obtain the exact model evidence and inspect an actual sample before distribution.

Product Safety Australia recall notice PRA2026/21078 (opens in a new tab)

Standards transition · 12 February 2028

Charging and storage equipment get new classes

Energy Safe Victoria lists new classes for EV supply equipment, battery energy storage systems and portable power stations from February 2028. Other classes in the 2026 amendment change on different dates.

What to check Track the effective date for your equipment class and the planned supply date of each model. Have Compliance recheck products that will still be sold after a change.

Energy Safe Victoria class definitions and effective dates (opens in a new tab)
DATES AND TRIGGERS

Official milestones

See the deadline calendar
  • Before supply

    Verify classification, evidence, registration and markings

    Use the first offer and each destination as release checks. Keep the supplier, equipment and certificate identifiers separate.

    Official reference (opens in a new tab)
  • Annually

    Renew the Responsible Supplier registration

    Set this reminder separately from the equipment and certificate expiry dates.

    Official reference (opens in a new tab)
  • Within ten business days of a request

    Produce the Level 2 Compliance Folder

    The EESS Level 2 guidance sets this period. Have an alternate owner who can retrieve the current folder.

    Official reference (opens in a new tab)
  • 12 February 2028

    Check new equipment classes

    Energy Safe Victoria lists new classes for EV supply equipment, battery energy storage systems and portable power stations under the 2026 amendment.

    Official reference (opens in a new tab)
The whole journeyabout 49 days across 4 steps
  1. 01Classify the model and each market, Product compliance + electrical engineer + local importer, about 7 days
  2. 02Build the evidence and obtain certification, Electrical engineer + supplier quality + recognized certifier, about 21 days
  3. 03Link the supplier, equipment and label, Authorised Officer + Regulatory Affairs + Finance, about 7 days
  4. 04Track renewals, changes and safety incidents, Product compliance + Quality + Distribution, about 14 days
IMPLEMENTATION ROADMAP

Step by step

Checklist, instructions and 8 templates.

View plan as a table
Project roadmap with current target dates and completion status
StepOwnerWhen to actEstimated targetDeliverablesStatus
Classify the model and each marketProduct compliance + electrical engineer + local importerBefore locking the design or placing an orderSet a start dateEESS model and market classification; Role mapOpen
Build the evidence and obtain certificationElectrical engineer + supplier quality + recognized certifierBefore product registration or saleSet a start dateEESS test and certification evidence; Test reportsOpen
Link the supplier, equipment and labelAuthorised Officer + Regulatory Affairs + FinanceBefore offering the product for saleSet a start dateEESS registration and release record; DeclarationOpen
Track renewals, changes and safety incidentsProduct compliance + Quality + DistributionDuring supply and before changing a model or componentSet a start dateEESS renewal and change register; Corrective-action registerOpen
0 of 4 completeOpen workspace

Targets use illustrative calendar-day estimates and assume the steps run in sequence. Check official dates and agree real durations with your team.

  1. 01

    Classify the model and each market

    Who Product compliance + electrical engineer + local importer When Before locking the design or placing an order

    Record input ratings, intended uses, actual household suitability, trade names, models, plug and cord. Check local scope and the equipment class definitions in effect for the market and sale date. Identify the manufacturer or first importer who will act as Responsible Supplier.

    How to do this step

    Before you start

    Sale sample, rating and label, intended-use claims, product configuration and planned sales destinations.

    1. Compare each model and planned date with the current class list and local regulator requirements. Include plugs, cords and bundled equipment.
    2. Identify the legal entity who will supply each market and obtain the electrical specialist’s signed classification. Share the route with the purchasing owner.

    What a reviewer should see

    Every sales destination and configuration has a dated classification decision and an accountable entity.

    When to escalate

    Hold a market or model for which classification or importer responsibility is unresolved.

    What to produce

    EESS model and market classificationSpreadsheet

    Gather first

    • Engineering specification
    • Actual label and plug drawings
    • Intended uses and sales materials
    • Class definitions and transition dates
    • List of sales destinations

    How to prepare it

    1. Create one row per trade name, model and electrical configuration. Record the input voltage and whether the product is designed or marketed for household, personal or similar use. Include any power supply, plug or cord that ships with it.
    2. Identify the local regulator for each destination and the local manufacturer or first importer. Compare the model with the current class definitions and confirm applicable standards, editions and transitions with an electrical specialist.
    3. Have the specialist approve a dated classification per model. Record differing New Zealand or Australian state requirements and hold orders with an unresolved route.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Fictional product
    230 V AC household toaster, model CR-T2, under the Cedar Range retail brand. Verify the nameplate, total input rating and included cord.
    Australian route
    For Victoria, the bread toaster definition is Level 3. The class list identifies AS/NZS 60335.2.9. The engineer confirms the applicable editions, general requirements and any amendments with the certifier.
    New Zealand expansion
    Check the local declared article category and importer before quoting delivery. Record the approval basis and any New Zealand marking requirements in a separate market row.

    Check before handing it over

    The signed classification covers the real sale configuration, intended use, effective class definitions and who is responsible in each market.

    Give Product and Procurement the approved model list and the evidence they must obtain before any purchase order or listing is released.

    Role mapMemo

    Gather first

    • Named roles, on-call contacts and authority
    • Realistic use cases and deadlines
    • Service and vendor dependencies

    How to prepare it

    1. Start with the event or decision and identify who acts first, who has approval authority and who covers absences.
    2. Write the sequence of handoffs and the information each recipient needs. Name the channel, timing and escalation if no one responds.
    3. Rehearse a case and record what broke. Fix missing contacts, duplicate ownership or gaps before approving the playbook or role map.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Event or activity
    Unusual activity detected in support export portal
    First action and owner
    On-call engineer opens a restricted incident case and preserves logs.
    Decision owner and backup
    Privacy lead or legal duty contact will determine reporting.
    Handoff and clock
    Send incident ID, UTC timestamp and known scope immediately.
    Validation
    Exercise completed and backup contact reached.

    Check before handing it over

    Every decision has one accountable person, a backup and a practical route to reach them.

    Share the approved instructions with the people expected to follow them and test the handoffs at the next exercise.

  2. 02

    Build the evidence and obtain certification

    Who Electrical engineer + supplier quality + recognized certifier When Before product registration or sale

    Keep applicable safety evidence for Level 1. Build and maintain the Level 2 Compliance Folder in English with assessed test evidence. Obtain a valid Certificate of Conformity from a recognized certifier for Level 3, and verify it is listed for the exact model and standard. Check any separate plug and cord evidence.

    How to do this step

    Before you start

    Approved model scope, lab reports, equipment photos, bill of materials and certificate information.

    1. For each model, match safety-critical components and ratings to the reports. Confirm who assessed the evidence and the current edition of each applicable standard.
    2. Index the Level 2 Compliance Folder or verify the Level 3 Certificate of Conformity and associated record. Record gaps and the person who can resolve them.

    What a reviewer should see

    Quality and the authorized filer can find the evidence and verify that it covers the exact intended configuration.

    When to escalate

    Hold a configuration with unverified standards, substitute components or an expired or mismatched certificate.

    What to produce

    EESS test and certification evidenceSpreadsheet

    Gather first

    • Approved classification
    • Lab report and tested model photographs
    • Bill of materials and component approvals
    • Label and instructions
    • Certificate details as applicable

    How to prepare it

    1. Match the tested sample to each intended trade name, model, rating, safety-critical component, marking and instruction. Record the report number, applicable standard edition and issuer or assessor.
    2. For Level 2, build the English Compliance Folder from the reports, model photos, markings and component evidence. Verify that the evidence has been properly assessed and retain a locator that a second person can use.
    3. For Level 3, check the certificate issuer, scope, listed standards, model or variant details and current status. Reconcile the certificate with the platform entry before using it to register the equipment.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Fictional model check
    Lab report for CR-T2 covers the original cord and plug assembly. Supplier proposes a substitute. Quality puts the change on hold and asks the engineer and certifier to confirm whether additional evidence or a certificate update is needed.
    Level 3 evidence
    Record the recognized certificate issuer, certificate number, listed trade name and model, tested rating, expiry and public verification date.
    Access check
    A second team member opens the current evidence without using the original filer’s account. Record the archive owner and retrieval result.

    Check before handing it over

    The reports, certificate and actual sale unit can be matched from the file, and any configuration differences are resolved.

    Give the verified evidence to the Authorised Officer and the model-specific limits to Purchasing and Quality.

    Test reportsMemo

    Gather first

    • Approved test scope and criteria
    • Population and sample records
    • Test approach, results and reviewer requirements

    How to prepare it

    1. State objective, dates, scope and the method before describing results. Record the tester, any independence requirements, and how samples were selected.
    2. For each item, compare what should have happened with what the evidence shows. Describe impact and link the evidence or recorded exception.
    3. Add limitations, obtain review and give each finding an owner and a date. Retain the underlying samples and calculations with the signed version.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Test objective
    Check that production role removals happen within the internal deadline.
    Method and population
    All September departures. Test each privileged account.
    Expected result
    Remove access within one business day.
    Observed result
    11 on time. One late by two days, ticket IAM-114.
    Finding and follow-up
    F-008. Retest the next departure and verify alerting.

    Check before handing it over

    Someone who did not run the test can reproduce the result and tell a finding from a scope limitation.

    Give management the findings and evidence links. Share observations with an external reviewer where the engagement calls for it.

  3. 03

    Link the supplier, equipment and label

    Who Authorised Officer + Regulatory Affairs + Finance When Before offering the product for sale

    Verify the Australian or New Zealand legal entity and ABN or IRD number, complete the Responsible Supplier declaration, and register Level 2 or 3 equipment with the relevant declaration. Verify the model, trade name and supplier in the public search. Check the Regulatory Compliance Mark on the actual unit and confirm the applicable NSW or New Zealand route where relevant.

    How to do this step

    Before you start

    Declarations, current evidence, supplier identity, EESS platform access, fee schedule and sale sample.

    1. Complete the required supplier and equipment steps and verify the public entries. Assess the applicable state or New Zealand route before extending sales.
    2. Inspect the sale unit’s label and approval mark. Pass the release record and dates to Distribution, retailers and e-commerce owners.

    What a reviewer should see

    The signed decision identifies the permitted model, supplier, market, label and evidence for release.

    When to escalate

    Block a listing where a required entry, linked certificate, local approval or marking is missing.

    What to produce

    EESS registration and release recordChecklist

    Gather first

    • Authorised Officer and registered entity details
    • Equipment declaration
    • Test or certificate evidence
    • Label sample
    • Fees and public search record

    How to prepare it

    1. Have the Authorised Officer verify the Responsible Supplier legal identity, ABN or IRD number and active status. Confirm which entity first manufactures or imports the equipment into the supply chain.
    2. For Level 2 or 3, complete the applicable equipment declaration, link the appropriate evidence, pay and verify the equipment number and status. For Level 1, verify the supplier and the safety evidence whether or not the product is voluntarily registered.
    3. Compare a physical sale unit and package against the approved model, rating and applicable RCM rules. In New Zealand, if using deemed approval under regulation 83A or 86A, verify the product entry and that the New Zealand manufacturer or importer is registered for that article. Save evidence of any separate rules that apply.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Fictional release decision
    CR-T2 for Victoria. Authorised Officer checks the supplier and model in EESS public search, confirms the linked current certificate and dates the evidence. Quality photographs the actual sale unit and RCM.
    Published fee example
    At the rates effective 1 July 2026, one supplier year at AUD 239.74 and one equipment year at AUD 89.85 total AUD 329.59 in registration fees. Obtain any lab and certification quotes separately.
    Retail handoff
    Send the retailer the supplier’s registered name, model, trade name, equipment number and latest verification date. Require a new check before accepting a replacement.

    Check before handing it over

    The market release record ties the actual unit to the applicable registration, certificate, marking and accountable legal entity.

    Give Sales only the approved markets, models and identifiers. Keep the signed release and authority receipts accessible to Quality.

    DeclarationMemo

    Gather first

    • Applicable form or requirements
    • Approved scope and supporting records
    • Named signatory and approval route

    How to prepare it

    1. Identify which person can sign and what they must confirm. Gather supporting evidence, dates, responsibility and any required issuer wording.
    2. Draft a signed-document checklist or brief in your organization’s approved format. Reconcile every factual claim against the source evidence and route the draft for review.
    3. Use the applicable official wording or format for the real signed document. File the executed copy with its date, applicable scope and supporting evidence.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Document owner
    Accountable executive or authorized signatory
    Scope and date
    Agreed service scope, as of 2026-10-31
    Supporting documents
    Scope v3, final control testing and open issue review
    Review and approval
    Legal and responsibility owner review before signature
    Filed record
    Signed copy plus evidence references

    Check before handing it over

    The signer can explain the basis for each statement and the record reflects the required scope and period.

    Give the executed document to the relevant recipient under the engagement or regulation. Use the worksheet to organize review.

  4. 04

    Track renewals, changes and safety incidents

    Who Product compliance + Quality + Distribution When During supply and before changing a model or component

    Track supplier, equipment and certificate dates separately. Recheck standards, component substitutions, model and label changes before authorizing them. Keep the Level 2 folder current and retain it for five years after registration ends. Trace batches and destinations so the team can isolate affected stock and act on a safety issue.

    How to do this step

    Before you start

    Supplier, equipment and certification dates, model change tickets, evidence retention and batch records.

    1. Assign distinct renewal reminders and trigger another review before replacing components, moving production or changing labels.
    2. Run a lot trace and verify staff can retrieve the evidence folder. Follow the destination regulator’s safety reporting and recall route when applicable.

    What a reviewer should see

    Quality can retrieve the correct evidence for a batch, its release decision and any later changes.

    When to escalate

    Escalate an incident or a failed retrieval to the owner with authority to stop supply.

    What to produce

    EESS renewal and change registerSpreadsheet

    Gather first

    • Supplier and equipment register entries
    • Certificate and standard dates
    • Component change records
    • Batch and retailer records
    • Level 2 evidence retention schedule

    How to prepare it

    1. Record each supplier, equipment and certificate date in separate fields. Give renewal owners early reminders and verify that the registration term fits the certificate where required.
    2. Route changes to components, factory, label, trade name or claimed standard to the engineering and regulatory owners. Capture a new sample and obtain an updated report, certificate or registration when required.
    3. Keep evidence current, including the Level 2 folder for five years after the registration ends. Link safety complaints and incident reports to batches and recipients and give Distribution the process for stopping supply.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Fictional renewal dates
    Supplier registration expires 15 May 2027. The model’s certificate expires 2 February 2028. Finance and Regulatory Affairs own separate checks and confirm the equipment term against both.
    Change ticket
    CR-T2 plug change. Quality logs the new part, factory lot, approval documents and nameplate photo. Compliance holds sale until it verifies the evidence for the new configuration.
    Traceability check
    Distribution provides lot and retailer records on demand. Quality can identify the relevant test and registration files from a returned unit’s label.

    Check before handing it over

    A reviewer can see which models were approved at any point, when their evidence expires and who can retrieve it or stop supply.

    Share next due dates and confirmed changes with the importer, distributors and the team that controls listings.

    Corrective-action registerSpreadsheet

    Gather first

    • Finding, risk or test exception
    • Root-cause analysis
    • Named owner, due date and expected evidence

    How to prepare it

    1. Record the observation and link the exact test or requirement. Describe the business effect and investigate why the issue was able to happen.
    2. Separate immediate containment from the permanent fix. Give each action an owner, date, verification method and any required approval for deferral.
    3. Retest against the original failure once the fix is live. Record who accepted the outcome and keep unresolved issues visible.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Finding or risk
    F-008, a departed contractor retained production access
    Cause and effect
    HR event never reached IAM. Admin access remained active.
    Action and owner
    Revoke access and alert on failed HR sync. IAM lead.
    Due and status
    2026-11-28, in progress
    Closure test
    Simulate departure and verify access disappears within policy
    Approver and evidence
    Risk owner, ticket IAM-114 and retest results

    Check before handing it over

    The closure test addresses the original problem and has a dated result from an independent reviewer where required.

    Send open items and decisions to governance, audit or the assessor on the applicable cadence.

PRIMARY REFERENCES

Official sources

How we build these guides

Keyboard shortcuts

⌘K or /
Search everything
?
This list
g h
Home
g l
Guide library
g f
Find my path
g t
Templates
g p
Playbooks
g w
My workspace
g d
Deadline calendar
g c
Regulatory changes