CodeMark Australia building product certification and certificate verification

Prepare the product scope, National Construction Code evidence and quality plan for certification. Check a live certificate against the actual product and installation before relying on it.

Issuing authority
Australian Building Codes Board and JASANZ-accredited CodeMark certification bodies
Timing
Ask the certification body to quote evaluation, audit and surveillance. Under the scheme rules a certificate is valid for three years unless suspended or withdrawn. Initial surveillance is within 12 months of issue and routine intervals are no longer than 12 months.
Reviewed
Inside this guide
4 steps · 4 templates

Who it applies to

Manufacturers, importers and other applicants seeking a Certificate of Conformity for a building product or system, and project teams specifying or accepting it under the National Construction Code (NCC).

What you’ll produce

A certificate covering defined products, uses and NCC provisions if granted, a current register entry and a record of how a project meets the conditions.

For each project, verify the adopted NCC edition and state or territory provisions. Use the complete certificate and referenced instructions. Match the product configuration, listed clauses, permitted construction and installation conditions to the project.

TEAM KICKOFF

Run the project

Go to the roadmap

Decisions for leadership

What do we need the certification to cover?
Confirm the applicable edition, sites, products or service boundary and the certification route. Budget for assessment, changes needed to pass, and maintaining certification.
Who will do the work and who can sign?
Appoint a sponsor, a day-to-day lead and a named owner for every workstream. Set aside their time and decide who can approve the outcome, accept remaining risk or authorize a filing.
Which deadlines can we promise?
Separate fixed external dates from internal targets. Confirm dependencies such as a vendor, test lab or assessor, and approve a backup plan if their dates slip.

How to spend the first week

  1. Ask the first-step owner to bring the most recent system, activity or product inventory and the contract or rule driving the work.
  2. Ask the appropriate assessor or program contact what scope they will review, what evidence they need, and which dates and fees they can confirm in writing.
  3. Record what the sponsor approved, open questions, work owners and the next date a decision is needed. Send the brief to everyone who needs to contribute evidence.

What to review each week

Monitor unresolved scope questions, controls without evidence, findings that need a retest and the next assessment or renewal date.

Kickoff brief to share with your team

Fill this in with your sponsor and send it to the people who own the work.

CodeMark Australia kickoff brief
Business reason and required outcome  [Contract, obligation or approval]
Scope and exclusions  [Entities, systems or activities, and reasons]
Fixed deadlines and internal milestones  [Date, source and owner]
Executive sponsor and authorized signer  [Names]
Project lead and backup  [Names]
First workstream  Define the product and intended uses · Product owner + building code specialist [Name and due date]
People, effort and external costs  [Estimate, owner and contingency]
Evidence folder and reviewer access  [Location, access owner and review date]
Decisions and blockers  [Item, options, owner and decision date]

First week
1. Ask the first-step owner to bring the most recent system, activity or product inventory and the contract or rule driving the work.
2. Ask the appropriate assessor or program contact what scope they will review, what evidence they need, and which dates and fees they can confirm in writing.
3. Record what the sponsor approved, open questions, work owners and the next date a decision is needed. Send the brief to everyone who needs to contribute evidence.
How to hand off evidence
  1. Record the requirement or claim, the person responsible, the period and the result. Link to the original report, configuration, test or case record.
  2. Include the version, system or product, date, and how you gathered the record. When a report covers a group of items, retain its filters and reconcile the count to the source.
  3. Ask the reviewer to open the evidence and reproduce the key check. Record their decision and date. Keep missing items or failures visible with an owner, a due date and a retest when needed.
  4. Share through the agreed channel. Keep sensitive originals in a restricted location and link any redacted copies to the corresponding originals.
BEFORE YOU START

How this works in practice

Two questions to check scope

  • Does the proposed use fit every relevant certificate limitation and referenced drawing?
  • Who can stop a substitution or design change before a certificate scope gap reaches site?

Worked scenario

A facade supplier proposes a panel system for Australian projects. The certifier agrees which assembly and NCC provisions will be evaluated. On a later project, the buyer checks the register and the building surveyor reviews a proposed substrate change against the current certificate.

What to read next

FROM THE SOURCE

Cases and numbers

NSW notice · 2019 withdrawals

9Cladding certificates listed as withdrawn by NSW

Register status can change after a product is specified

The NSW notice identifies nine withdrawn CodeMark certificates and explains that practitioners would need other evidence of suitability to support a compliant use of those products. It lists the certificate numbers and associated products.

What to check Save a dated register check at approval and recheck before a substitution or installation. Keep the certificate number searchable in project records.

NSW fire safety and external wall cladding notice (opens in a new tab)

ABCB application guidance

Ask for a quote across the certificate lifecycle

The certification body sets the commercial fees. ABCB identifies evidence quality and the complexity of the assessment as factors in the cost.

What to check Ask separately about technical review, lab evidence, factory visits, routine surveillance, scope changes and renewal.

ABCB guide to certifying a product (opens in a new tab)
DATES AND TRIGGERS

Official milestones

See the deadline calendar
The whole journeyabout 65 days across 4 steps
  1. 01Define the product and intended uses, Product owner + building code specialist, about 14 days
  2. 02Assemble test evidence and the Product Quality Plan, Engineering + factory quality + certification body, about 30 days
  3. 03Verify the certificate and approve project use, Procurement + designer + building surveyor, about 7 days
  4. 04Maintain surveillance, changes and renewal, Certificate holder + Quality + certifier, about 14 days
IMPLEMENTATION ROADMAP

Step by step

Checklist, instructions and 4 templates.

View plan as a table
Project roadmap with current target dates and completion status
StepOwnerWhen to actEstimated targetDeliverablesStatus
Define the product and intended usesProduct owner + building code specialistBefore requesting a certifier proposalSet a start dateCodeMark scope and NCC evidence matrixOpen
Assemble test evidence and the Product Quality PlanEngineering + factory quality + certification bodyBefore evaluation and factory reviewSet a start dateCodeMark evaluation and Product Quality PlanOpen
Verify the certificate and approve project useProcurement + designer + building surveyorBefore specifying, purchasing or substitutingSet a start dateCodeMark project acceptance recordOpen
Maintain surveillance, changes and renewalCertificate holder + Quality + certifierAfter issue and before approved product changesSet a start dateCodeMark surveillance and change registerOpen
0 of 4 completeOpen workspace

Targets use illustrative calendar-day estimates and assume the steps run in sequence. Check official dates and agree real durations with your team.

  1. 01

    Define the product and intended uses

    Who Product owner + building code specialist When Before requesting a certifier proposal

    List variants, components, production sites and intended installation conditions. Map proposed claims to the applicable NCC Performance Requirements or Deemed-to-Satisfy provisions. Check the certification body’s accreditation and get a quote with evaluation, surveillance and renewal costs.

    What to produce

    CodeMark scope and NCC evidence matrixSpreadsheet

    Gather first

    • Product drawings
    • Manufacturing locations
    • Proposed claims
    • Applicable NCC edition and state variations
    • JASANZ accreditation scope

    How to prepare it

    1. Give each assembly and variant a unique row. Record product, components, substrate, fixing system, installation limits and factory. Mark any options that will remain outside the proposed scope.
    2. Link each performance claim to the applicable NCC provision and evidence. Record the report revision, tested configuration, lab and any gap. Have the building code specialist and certification body agree the assessment boundary.
    3. Obtain a written proposal showing expected evidence, evaluation and surveillance scope, price and which findings could require retesting.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Fictional assembly
    Marshline FP-12 rainscreen assembly. Engineering lists the specific panel, supporting rail and substrate represented by its drawings.
    Open scope item
    A second substrate appears in the marketing draft. No evidence has yet been reviewed for that configuration. The Product owner removes it from the proposed claim pending assessment.
    Sign-off
    Product owns the claim, Engineering owns the evidence, and the building code specialist checks the edition and project assumptions.

    Check before handing it over

    Every claim has a verified NCC reference, a matching configuration and an evidence owner or named gap.

    Give the signed matrix and complete referenced records to the certification body.

  2. 02

    Assemble test evidence and the Product Quality Plan

    Who Engineering + factory quality + certification body When Before evaluation and factory review

    Reconcile tested samples and reports to controlled drawings. Agree where new tests or technical assessments are needed. Build the Appendix 1 Product Quality Plan around agreed procedures, owners, manufacturing and traceability checks, complaints and recall. Track findings and obtain written closeout.

    What to produce

    CodeMark evaluation and Product Quality PlanMemo

    Gather first

    • Agreed scope matrix
    • Full lab reports
    • Controlled drawings and specifications
    • Factory process map
    • Appendix 1 requirements

    How to prepare it

    1. Map the bill of materials, installed configuration and production process to the tested sample and report. Get written decisions on variations and evidence gaps.
    2. For each Appendix 1 requirement, name the procedure, person, frequency and evidence. Include incoming checks, manufacturing inspections, release, traceability, corrective action, complaints and recall.
    3. Review records from one trial lot before submitting. Track each evaluation finding with the requested action, owner, due date and certifier confirmation.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Incoming check
    For fictional FP-12, receiving verifies the specified panel core against the approved bill of materials. The recorded lot links to its supplier evidence.
    Trace exercise
    Quality starts with a dispatched serial or lot and retrieves the factory inspection, approved component batch and customer shipment.
    Finding example
    Work instruction revision differs from the approved drawing. Engineering reconciles the revisions, trains the line lead and submits the new production record for closeout.

    Check before handing it over

    A reviewer can link the tested configuration to production controls and verify open and closed findings.

    Give the certifier a dated copy. Keep the approved version accessible to production and field quality staff.

  3. 03

    Verify the certificate and approve project use

    Who Procurement + designer + building surveyor When Before specifying, purchasing or substituting

    Search the certificate number and retrieve the current complete certificate. Compare the model, version, conditions, code edition, installation and underlying assembly to the design and order. Refer differences in scope to the designer and appropriate authority before relying on the certificate.

    What to produce

    CodeMark project acceptance recordChecklist

    Gather first

    • Current complete certificate and register entry
    • Project drawings and specifications
    • NCC edition and local variations
    • Purchase order and installation instructions

    How to prepare it

    1. Search the advertised certificate number in the JASANZ CodeMark register. Save the verification date, status, issuer and complete certificate version with any referenced instructions.
    2. Compare the specified product, application and installation with each certificate condition. Check model, site use, construction and components against the actual order and design.
    3. Assign the project designer and appropriate approval authority any scope gaps. Record their decision, additional evidence and site checks before accepting a substitution.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Fictional substitution
    FP-12’s installation drawing specifies one substrate. A contractor proposes a different substrate. Procurement pauses acceptance while the designer checks the certificate and confirms how the new design will be substantiated.
    Retained evidence
    Current certificate and public register status, project drawing revision, marked comparison, approval decision and inspection evidence.

    Check before handing it over

    The acceptance decision identifies what the certificate covers and what evidence supports every difference.

    Attach the approval to the procurement and construction records, then give Site Quality the conditions to verify.

  4. 04

    Maintain surveillance, changes and renewal

    Who Certificate holder + Quality + certifier When After issue and before approved product changes

    Schedule surveillance and review any product, process or code change with the certifier. Keep the Product Quality Plan and traceability current. If suspended or withdrawn, notify existing customers and cease using the certificate, mark and number as required by Rule 35. Track renewal against actual expiry.

    What to produce

    CodeMark surveillance and change registerSpreadsheet

    Gather first

    • Certificate and expiry
    • Product Quality Plan
    • Surveillance reports
    • Product change requests
    • Complaints, dispatch records and recall procedures

    How to prepare it

    1. Record issue, first surveillance, routine surveillance, supply-chain review and expiry as distinct rows or fields. Confirm dates with the certification body.
    2. Before changing specifications, processes or factories, record what changes, affected batches and evidence. Send the required notice and retain the certifier’s decision and any amended certificate.
    3. If the listing is suspended or withdrawn, notify existing customers and cease use of the certificate and mark as required. Where a product fails to meet the BCA or certificate claims, activate the Rule 35 recall and reporting process.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Fictional dates
    Certificate issued 18 November 2026. Initial surveillance due by 18 November 2027. Confirm the exact expiry and subsequent dates with the certifier.
    Change ticket
    Proposed adhesive substitution. Quality identifies affected parts, keeps the existing design in production and asks the certifier to confirm the evidence and approval needed.

    Check before handing it over

    The owner can show the current certified scope, next review date, decisions on changes and who receives status alerts.

    Keep the register with Quality and send revised approved claims to Sales and the installation team.

PRIMARY REFERENCES

Official sources

How we build these guides

Keyboard shortcuts

⌘K or /
Search everything
?
This list
g h
Home
g l
Guide library
g f
Find my path
g t
Templates
g p
Playbooks
g w
My workspace
g d
Deadline calendar
g c
Regulatory changes