Template library
COPRSETR WORKSHEET

CodeMark evaluation and Product Quality Plan

CodeMark Australia · Step 2 · Assemble test evidence and the Product Quality Plan
Who prepares it
Engineering + factory quality + certification body
When to prepare it
Before evaluation and factory review

Template fields

Fill in each section with details from your work.

Incoming check
[Add details here]
Trace exercise
[Add details here]
Finding example
[Add details here]

Gather first

  • Agreed scope matrix
  • Full lab reports
  • Controlled drawings and specifications
  • Factory process map
  • Appendix 1 requirements

How to prepare it

  1. Map the bill of materials, installed configuration and production process to the tested sample and report. Get written decisions on variations and evidence gaps.
  2. For each Appendix 1 requirement, name the procedure, person, frequency and evidence. Include incoming checks, manufacturing inspections, release, traceability, corrective action, complaints and recall.
  3. Review records from one trial lot before submitting. Track each evaluation finding with the requested action, owner, due date and certifier confirmation.

Review

A reviewer can link the tested configuration to production controls and verify open and closed findings.

Handoff

Give the certifier a dated copy. Keep the approved version accessible to production and field quality staff.

Use the issuer’s current instructions and any required forms when you submit.

CodeMark rules and Appendix 1 (opens in a new tab)

Keyboard shortcuts

⌘K or /
Search everything
?
This list
g h
Home
g l
Guide library
g f
Find my path
g t
Templates
g p
Playbooks
g w
My workspace
g d
Deadline calendar
g c
Regulatory changes