COPRSETR WORKSHEET
CodeMark evaluation and Product Quality Plan
CodeMark Australia · Step 2 · Assemble test evidence and the Product Quality Plan- Who prepares it
- Engineering + factory quality + certification body
- When to prepare it
- Before evaluation and factory review
Worked example
This example uses fictional details. Use the same fields with evidence from your work.
- Incoming check
- For fictional FP-12, receiving verifies the specified panel core against the approved bill of materials. The recorded lot links to its supplier evidence.
- Trace exercise
- Quality starts with a dispatched serial or lot and retrieves the factory inspection, approved component batch and customer shipment.
- Finding example
- Work instruction revision differs from the approved drawing. Engineering reconciles the revisions, trains the line lead and submits the new production record for closeout.
Gather first
- Agreed scope matrix
- Full lab reports
- Controlled drawings and specifications
- Factory process map
- Appendix 1 requirements
How to prepare it
- Map the bill of materials, installed configuration and production process to the tested sample and report. Get written decisions on variations and evidence gaps.
- For each Appendix 1 requirement, name the procedure, person, frequency and evidence. Include incoming checks, manufacturing inspections, release, traceability, corrective action, complaints and recall.
- Review records from one trial lot before submitting. Track each evaluation finding with the requested action, owner, due date and certifier confirmation.
Review
A reviewer can link the tested configuration to production controls and verify open and closed findings.
Handoff
Give the certifier a dated copy. Keep the approved version accessible to production and field quality staff.
Use the issuer’s current instructions and any required forms when you submit.
CodeMark rules and Appendix 1 (opens in a new tab)