Start hereChoose the tool, boundary and transaction date
~49 days leftOpen step
Guide library
Certification Asia–Pacific

NABERS building performance ratings

Australia NABERS ratings for building energy, water, waste and indoor environment

Choose a supported rating and boundary, assemble acceptable operating records, and work with an accredited assessor to certify the result.

Issuing authority
National Australian Built Environment Rating System (NABERS)
Timing
Office energy and water use 12 months of acceptable data. Lodge within 120 calendar days of the end of that period to preserve as much validity as the rules allow. Check the issued expiry and the rules for other tools.
Reviewed
Inside this guide
4 steps · 4 templates

Who it applies to

Building owners, managers and tenants commissioning a rating. Tool availability and data requirements depend on the sector, rating type and scope. Check separate Commercial Building Disclosure (CBD) duties when offering office space for sale, lease or sublease.

What you’ll produce

A certified rating for a defined property, boundary and period, supported by a traceable evidence pack. A disclosure-affected office may also need a registered Building Energy Efficiency Certificate (BEEC).

For an office energy rating, base building, tenancy and whole building use different boundaries. Confirm who controls each meter, which areas it serves and which records the assessor accepts before promising a transaction date.

TEAM KICKOFF

Run the project

Go to the roadmap

Decisions for leadership

What do we need the certification to cover?
Confirm the applicable edition, sites, products or service boundary and the certification route. Budget for assessment, changes needed to pass, and maintaining certification.
Who will do the work and who can sign?
Appoint a sponsor, a day-to-day lead and a named owner for every workstream. Set aside their time and decide who can approve the outcome, accept remaining risk or authorize a filing.
Which deadlines can we promise?
Separate fixed external dates from internal targets. Confirm dependencies such as a vendor, test lab or assessor, and approve a backup plan if their dates slip.

How to spend the first week

  1. Ask the first-step owner to bring the most recent system, activity or product inventory and the contract or rule driving the work.
  2. Ask the appropriate assessor or program contact what scope they will review, what evidence they need, and which dates and fees they can confirm in writing.
  3. Record what the sponsor approved, open questions, work owners and the next date a decision is needed. Send the brief to everyone who needs to contribute evidence.

What to review each week

Monitor unresolved scope questions, controls without evidence, findings that need a retest and the next assessment or renewal date.

Kickoff brief to share with your team

Fill this in with your sponsor and send it to the people who own the work.

NABERS building performance ratings kickoff brief
Business reason and required outcome  [Contract, obligation or approval]
Scope and exclusions  [Entities, systems or activities, and reasons]
Fixed deadlines and internal milestones  [Date, source and owner]
Executive sponsor and authorized signer  [Names]
Project lead and backup  [Names]
First workstream  Choose the tool, boundary and transaction date · Asset manager + leasing lead + accredited assessor [Name and due date]
People, effort and external costs  [Estimate, owner and contingency]
Evidence folder and reviewer access  [Location, access owner and review date]
Decisions and blockers  [Item, options, owner and decision date]

First week
1. Ask the first-step owner to bring the most recent system, activity or product inventory and the contract or rule driving the work.
2. Ask the appropriate assessor or program contact what scope they will review, what evidence they need, and which dates and fees they can confirm in writing.
3. Record what the sponsor approved, open questions, work owners and the next date a decision is needed. Send the brief to everyone who needs to contribute evidence.
How to hand off evidence
  1. Record the requirement or claim, the person responsible, the period and the result. Link to the original report, configuration, test or case record.
  2. Include the version, system or product, date, and how you gathered the record. When a report covers a group of items, retain its filters and reconcile the count to the source.
  3. Ask the reviewer to open the evidence and reproduce the key check. Record their decision and date. Keep missing items or failures visible with an owner, a due date and a retest when needed.
  4. Share through the agreed channel. Keep sensitive originals in a restricted location and link any redacted copies to the corresponding originals.
BEFORE YOU START

How this works in practice

Two questions to check scope

  • Which equipment and floor areas sit inside the rating boundary, and who can prove it?
  • Does a transaction require a registered BEEC or a particular rating scope before advertising starts?

Worked scenario

A Sydney property owner plans to lease 1,200 square metres of office space. The team checks whether the offer is disclosure affected, asks an assessor to confirm the required boundary, and investigates a shared meter before using the resulting rating in transaction material.

What to read next

  • CodeMark Australia

    Review a separate product certification route when specifying new building systems.

FROM THE SOURCE

Cases and numbers

FY27 administration fees · from 1 July 2026

AUD 1,935Standard office single-rating administration fee, including GST

Budget for both lodgement and the assessment

The FY27 schedule lists AUD 970 for an eligible small-building single rating. The independent assessor’s work is a separate cost.

What to check Ask whether the scope qualifies for a discount and request an itemised quote that includes the site visit and any additional disclosure work.

NABERS pricing and FY27 fee schedule (opens in a new tab)

NABERS case study · November 2026

4 starsNABERS Energy rating reported for Grosvenor Place during refurbishment

A building can change its energy use during refurbishment

NABERS profiled Grosvenor Place in Sydney, where the original design made ice overnight and used it for daytime cooling. The case study reports the rating during a period of major refurbishment.

What to check Keep a record of changes to plant, occupancy and operating hours so the owner can explain changes in performance between assessment periods.

NABERS case study on Grosvenor Place (opens in a new tab)
DATES AND TRIGGERS

Official milestones

See the deadline calendar
The whole journeyabout 49 days across 4 steps
  1. 01Choose the tool, boundary and transaction date, Asset manager + leasing lead + accredited assessor, about 7 days
  2. 02Reconcile meters and source records, Facilities + utilities analyst + tenants, about 21 days
  3. 03Support the assessment and check the issued rating, Accredited assessor + site manager + asset owner, about 14 days
  4. 04Publish approved claims and plan the next rating, Leasing + sustainability + facilities, about 7 days
IMPLEMENTATION ROADMAP

Step by step

Checklist, instructions and 4 templates.

View plan as a table
Project roadmap with current target dates and completion status
StepOwnerWhen to actEstimated targetDeliverablesStatus
Choose the tool, boundary and transaction dateAsset manager + leasing lead + accredited assessorBefore commissioning the rating or advertisingSet a start dateNABERS scope and disclosure briefOpen
Reconcile meters and source recordsFacilities + utilities analyst + tenantsAcross the agreed rating periodSet a start dateNABERS meter and evidence workbookOpen
Support the assessment and check the issued ratingAccredited assessor + site manager + asset ownerBefore lodging and when certification is receivedSet a start dateNABERS assessment and lodgement recordOpen
Publish approved claims and plan the next ratingLeasing + sustainability + facilitiesBefore advertising and throughout the next periodSet a start dateNABERS publication and renewal recordOpen
0 of 4 completeOpen workspace

Targets use illustrative calendar-day estimates and assume the steps run in sequence. Check official dates and agree real durations with your team.

  1. 01

    Choose the tool, boundary and transaction date

    Who Asset manager + leasing lead + accredited assessor When Before commissioning the rating or advertising

    Match the building type and objective to a rating tool. For offices, agree the base building, tenancy or whole building boundary and confirm CBD applicability, exemptions and assessor accreditation. Get an itemised quote for the work and lodgement.

    What to produce

    NABERS scope and disclosure briefMemo

    Gather first

    • Asset and tenant details
    • Proposed lease or sale
    • Floor plans and net lettable area
    • Rating tools
    • Assessor credentials

    How to prepare it

    1. State the intended use of the rating and identify the correct sector and metric. For an office, compare tenancy, base building and whole building against who runs each service.
    2. For a transaction, record the offer type, net lettable area, current certificate and any exemption basis. Have the assessor and leasing team confirm whether a BEEC is required.
    3. Request written scope, site visit, deliverables, fee split, submission timing and who must resolve gaps. Verify the assessor holds the right accreditation.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Fictional case
    Pier House plans to offer 1,200 m² of commercial office space for lease. Leasing documents whether the offer is disclosure affected and what certificate will be needed before advertising.
    Scope decision
    Facilities proposes base building energy. The assessor confirms whether that scope fits the required transaction evidence and lists shared services that need investigation.

    Check before handing it over

    The brief identifies the building, rating tool, boundary, regulatory decision, fee and accountable owners.

    Give the accepted brief to Facilities, the assessor and Leasing before starting data collection or campaign planning.

  2. 02

    Reconcile meters and source records

    Who Facilities + utilities analyst + tenants When Across the agreed rating period

    Map meters, fuel types and imports or exports to the rated space. Obtain complete source invoices or validated reads, floor areas and operating records required by the tool. Log gaps and overlaps and agree with the assessor how to resolve them.

    What to produce

    NABERS meter and evidence workbookSpreadsheet

    Gather first

    • Meter schedule
    • Invoices and interval reads
    • Floor plans and area calculations
    • Occupancy or operating records
    • Current tool rules

    How to prepare it

    1. Assign each meter a serial, location, fuel or resource, period, units, source file and boundary decision. Preserve original documents and log any conversion or allocation.
    2. Reconcile utility invoice dates and read periods to the agreed 12 months for office energy or water. Flag gaps, estimated bills, overlapping reads, vacancies and load from adjacent areas.
    3. Have site staff confirm what each shared meter serves. Record the assessor’s rule-based decision and supporting evidence for each exception.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Fictional row
    M-07 is a shared feed. The invoice covers common areas and a tenant circuit. Facilities supplies the single-line diagram and submeter records so the assessor can decide which data are acceptable.
    Evidence issue
    One billing period is missing during a supplier change. The utilities analyst requests the original read history and logs the date, owner and resolution.

    Check before handing it over

    A reviewer can trace each rating input to its original source and each boundary or exception to a documented decision.

    Send the reconciled pack to the assessor with unresolved questions and named contacts.

  3. 03

    Support the assessment and check the issued rating

    Who Accredited assessor + site manager + asset owner When Before lodging and when certification is received

    Arrange inspection access and reconcile the evidence with the reviewer’s questions. Have the assessor track lodgement, any quality checks and the actual issue and expiry dates. Confirm the property, boundary and metric shown on the certificate before publishing a claim.

    What to produce

    NABERS assessment and lodgement recordSpreadsheet

    Gather first

    • Accepted evidence pack
    • Site access plan
    • Meter photographs
    • Assessor checklist and correspondence
    • Rating period end

    How to prepare it

    1. Confirm site access and show the assessor the meter, plant and areas in scope. Record any difference between observed equipment and the evidence pack.
    2. Track evidence acceptance, decisions and lodgement. For office energy or water, work back from the 120-day window and leave time for the National Administrator’s review and questions.
    3. On issue, compare the building address, rating boundary, stars, period and expiry to the commissioning brief. Follow up any discrepancy before relying on the rating.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Fictional period
    Office energy period ends 30 September 2026. The 120-day date is 28 January 2027. The assessor targets December and checks the actual certificate expiry on issue.
    Handoff record
    Save the lodgement reference, certificate, remaining conditions and the owner of the next rating.

    Check before handing it over

    The assessor’s submission and final certificate can be traced to the verified inputs and their period.

    Give the confirmed certificate to Leasing and the itemised follow-up list to Facilities.

  4. 04

    Publish approved claims and plan the next rating

    Who Leasing + sustainability + facilities When Before advertising and throughout the next period

    For a covered transaction, confirm the current registered BEEC and include its applicable NABERS Energy rating in advertising. Align reports to the certified boundary and period. Set renewal ownership and review consumption, occupancy and meter changes each month.

    What to produce

    NABERS publication and renewal recordChecklist

    Gather first

    • Issued rating
    • Current BEEC if applicable
    • Advertising draft
    • Register lookup
    • Meter and occupancy change log

    How to prepare it

    1. Check the rating period, scope and expiry on the issued record. For a covered office transaction, verify the registered BEEC and align all advertisements with the rating it shows.
    2. Keep a dated copy of public claims and assign someone to withdraw or update them when a rating changes or expires.
    3. Set reminders from the actual certificate expiry. Collect monthly evidence and record changes that may affect the next period, such as meters, opening hours or leased areas.

    Worked example

    Fictional details. Use the same fields with evidence from your work.

    Fictional publication check
    Pier House checks the registered BEEC before publishing its lease listing. The marketing approval records the relevant address, floor area, rating and expiry.
    Next cycle
    Facilities owns monthly meter checks. Leasing informs the assessor of any boundary or tenancy change before the new assessment starts.

    Check before handing it over

    Every published claim has a current supporting certificate and named people to update it.

    Notify marketing, leasing agents and sustainability reporting teams when the underlying record changes.

PRIMARY REFERENCES

Official sources

How we build these guides

Keyboard shortcuts

⌘K or /
Search everything
?
This list
g h
Home
g l
Guide library
g f
Find my path
g t
Templates
g p
Playbooks
g w
My workspace
g d
Deadline calendar
g c
Regulatory changes