National Australian Built Environment Rating System (NABERS)
Timing
Office energy and water use 12 months of acceptable data. Lodge within 120 calendar days of the end of that period to preserve as much validity as the rules allow. Check the issued expiry and the rules for other tools.
Reviewed
Inside this guide
4 steps · 4 templates
Who it applies to
Building owners, managers and tenants commissioning a rating. Tool availability and data requirements depend on the sector, rating type and scope. Check separate Commercial Building Disclosure (CBD) duties when offering office space for sale, lease or sublease.
What you’ll produce
A certified rating for a defined property, boundary and period, supported by a traceable evidence pack. A disclosure-affected office may also need a registered Building Energy Efficiency Certificate (BEEC).
For an office energy rating, base building, tenancy and whole building use different boundaries. Confirm who controls each meter, which areas it serves and which records the assessor accepts before promising a transaction date.
Confirm the applicable edition, sites, products or service boundary and the certification route. Budget for assessment, changes needed to pass, and maintaining certification.
Who will do the work and who can sign?
Appoint a sponsor, a day-to-day lead and a named owner for every workstream. Set aside their time and decide who can approve the outcome, accept remaining risk or authorize a filing.
Which deadlines can we promise?
Separate fixed external dates from internal targets. Confirm dependencies such as a vendor, test lab or assessor, and approve a backup plan if their dates slip.
How to spend the first week
Ask the first-step owner to bring the most recent system, activity or product inventory and the contract or rule driving the work.
Ask the appropriate assessor or program contact what scope they will review, what evidence they need, and which dates and fees they can confirm in writing.
Record what the sponsor approved, open questions, work owners and the next date a decision is needed. Send the brief to everyone who needs to contribute evidence.
What to review each week
Monitor unresolved scope questions, controls without evidence, findings that need a retest and the next assessment or renewal date.
Kickoff brief to share with your team
Fill this in with your sponsor and send it to the people who own the work.
NABERS building performance ratings kickoff brief
Business reason and required outcome [Contract, obligation or approval]
Scope and exclusions [Entities, systems or activities, and reasons]
Fixed deadlines and internal milestones [Date, source and owner]
Executive sponsor and authorized signer [Names]
Project lead and backup [Names]
First workstream Choose the tool, boundary and transaction date · Asset manager + leasing lead + accredited assessor [Name and due date]
People, effort and external costs [Estimate, owner and contingency]
Evidence folder and reviewer access [Location, access owner and review date]
Decisions and blockers [Item, options, owner and decision date]
First week
1. Ask the first-step owner to bring the most recent system, activity or product inventory and the contract or rule driving the work.
2. Ask the appropriate assessor or program contact what scope they will review, what evidence they need, and which dates and fees they can confirm in writing.
3. Record what the sponsor approved, open questions, work owners and the next date a decision is needed. Send the brief to everyone who needs to contribute evidence.
How to hand off evidence
Record the requirement or claim, the person responsible, the period and the result. Link to the original report, configuration, test or case record.
Include the version, system or product, date, and how you gathered the record. When a report covers a group of items, retain its filters and reconcile the count to the source.
Ask the reviewer to open the evidence and reproduce the key check. Record their decision and date. Keep missing items or failures visible with an owner, a due date and a retest when needed.
Share through the agreed channel. Keep sensitive originals in a restricted location and link any redacted copies to the corresponding originals.
BEFORE YOU START
How this works in practice
Two questions to check scope
Which equipment and floor areas sit inside the rating boundary, and who can prove it?
Does a transaction require a registered BEEC or a particular rating scope before advertising starts?
Worked scenario
A Sydney property owner plans to lease 1,200 square metres of office space. The team checks whether the offer is disclosure affected, asks an assessor to confirm the required boundary, and investigates a shared meter before using the resulting rating in transaction material.
Review a separate product certification route when specifying new building systems.
FROM THE SOURCE
Cases and numbers
FY27 administration fees · from 1 July 2026
AUD 1,935Standard office single-rating administration fee, including GST
Budget for both lodgement and the assessment
The FY27 schedule lists AUD 970 for an eligible small-building single rating. The independent assessor’s work is a separate cost.
What to check Ask whether the scope qualifies for a discount and request an itemised quote that includes the site visit and any additional disclosure work.
4 starsNABERS Energy rating reported for Grosvenor Place during refurbishment
A building can change its energy use during refurbishment
NABERS profiled Grosvenor Place in Sydney, where the original design made ice overnight and used it for daytime cooling. The case study reports the rating during a period of major refurbishment.
What to check Keep a record of changes to plant, occupancy and operating hours so the owner can explain changes in performance between assessment periods.
Targets use illustrative calendar-day estimates and assume the steps run in sequence. Check official dates and agree real durations with your team.
01
Choose the tool, boundary and transaction date
Who Asset manager + leasing lead + accredited assessorWhen Before commissioning the rating or advertising
Match the building type and objective to a rating tool. For offices, agree the base building, tenancy or whole building boundary and confirm CBD applicability, exemptions and assessor accreditation. Get an itemised quote for the work and lodgement.
What to produce
NABERS scope and disclosure briefMemo
Gather first
Asset and tenant details
Proposed lease or sale
Floor plans and net lettable area
Rating tools
Assessor credentials
How to prepare it
State the intended use of the rating and identify the correct sector and metric. For an office, compare tenancy, base building and whole building against who runs each service.
For a transaction, record the offer type, net lettable area, current certificate and any exemption basis. Have the assessor and leasing team confirm whether a BEEC is required.
Request written scope, site visit, deliverables, fee split, submission timing and who must resolve gaps. Verify the assessor holds the right accreditation.
Worked example
Fictional details. Use the same fields with evidence from your work.
Fictional case
Pier House plans to offer 1,200 m² of commercial office space for lease. Leasing documents whether the offer is disclosure affected and what certificate will be needed before advertising.
Scope decision
Facilities proposes base building energy. The assessor confirms whether that scope fits the required transaction evidence and lists shared services that need investigation.
Check before handing it over
The brief identifies the building, rating tool, boundary, regulatory decision, fee and accountable owners.
Give the accepted brief to Facilities, the assessor and Leasing before starting data collection or campaign planning.
Who Facilities + utilities analyst + tenantsWhen Across the agreed rating period
Map meters, fuel types and imports or exports to the rated space. Obtain complete source invoices or validated reads, floor areas and operating records required by the tool. Log gaps and overlaps and agree with the assessor how to resolve them.
What to produce
NABERS meter and evidence workbookSpreadsheet
Gather first
Meter schedule
Invoices and interval reads
Floor plans and area calculations
Occupancy or operating records
Current tool rules
How to prepare it
Assign each meter a serial, location, fuel or resource, period, units, source file and boundary decision. Preserve original documents and log any conversion or allocation.
Reconcile utility invoice dates and read periods to the agreed 12 months for office energy or water. Flag gaps, estimated bills, overlapping reads, vacancies and load from adjacent areas.
Have site staff confirm what each shared meter serves. Record the assessor’s rule-based decision and supporting evidence for each exception.
Worked example
Fictional details. Use the same fields with evidence from your work.
Fictional row
M-07 is a shared feed. The invoice covers common areas and a tenant circuit. Facilities supplies the single-line diagram and submeter records so the assessor can decide which data are acceptable.
Evidence issue
One billing period is missing during a supplier change. The utilities analyst requests the original read history and logs the date, owner and resolution.
Check before handing it over
A reviewer can trace each rating input to its original source and each boundary or exception to a documented decision.
Send the reconciled pack to the assessor with unresolved questions and named contacts.
Support the assessment and check the issued rating
Who Accredited assessor + site manager + asset ownerWhen Before lodging and when certification is received
Arrange inspection access and reconcile the evidence with the reviewer’s questions. Have the assessor track lodgement, any quality checks and the actual issue and expiry dates. Confirm the property, boundary and metric shown on the certificate before publishing a claim.
What to produce
NABERS assessment and lodgement recordSpreadsheet
Gather first
Accepted evidence pack
Site access plan
Meter photographs
Assessor checklist and correspondence
Rating period end
How to prepare it
Confirm site access and show the assessor the meter, plant and areas in scope. Record any difference between observed equipment and the evidence pack.
Track evidence acceptance, decisions and lodgement. For office energy or water, work back from the 120-day window and leave time for the National Administrator’s review and questions.
On issue, compare the building address, rating boundary, stars, period and expiry to the commissioning brief. Follow up any discrepancy before relying on the rating.
Worked example
Fictional details. Use the same fields with evidence from your work.
Fictional period
Office energy period ends 30 September 2026. The 120-day date is 28 January 2027. The assessor targets December and checks the actual certificate expiry on issue.
Handoff record
Save the lodgement reference, certificate, remaining conditions and the owner of the next rating.
Check before handing it over
The assessor’s submission and final certificate can be traced to the verified inputs and their period.
Give the confirmed certificate to Leasing and the itemised follow-up list to Facilities.
Who Leasing + sustainability + facilitiesWhen Before advertising and throughout the next period
For a covered transaction, confirm the current registered BEEC and include its applicable NABERS Energy rating in advertising. Align reports to the certified boundary and period. Set renewal ownership and review consumption, occupancy and meter changes each month.
What to produce
NABERS publication and renewal recordChecklist
Gather first
Issued rating
Current BEEC if applicable
Advertising draft
Register lookup
Meter and occupancy change log
How to prepare it
Check the rating period, scope and expiry on the issued record. For a covered office transaction, verify the registered BEEC and align all advertisements with the rating it shows.
Keep a dated copy of public claims and assign someone to withdraw or update them when a rating changes or expires.
Set reminders from the actual certificate expiry. Collect monthly evidence and record changes that may affect the next period, such as meters, opening hours or leased areas.
Worked example
Fictional details. Use the same fields with evidence from your work.
Fictional publication check
Pier House checks the registered BEEC before publishing its lease listing. The marketing approval records the relevant address, floor area, rating and expiry.
Next cycle
Facilities owns monthly meter checks. Leasing informs the assessor of any boundary or tenancy change before the new assessment starts.
Check before handing it over
Every published claim has a current supporting certificate and named people to update it.
Notify marketing, leasing agents and sustainability reporting teams when the underlying record changes.
Classify household electrical equipment, gather evidence for the exact model, and check supplier registration, equipment registration and labeling before supply.