COPRSETR WORKSHEET
NABERS meter and evidence workbook
NABERS building performance ratings · Step 2 · Reconcile meters and source records- Who prepares it
- Facilities + utilities analyst + tenants
- When to prepare it
- Across the agreed rating period
Worked example
This example uses fictional details. Use the same fields with evidence from your work.
- Fictional row
- M-07 is a shared feed. The invoice covers common areas and a tenant circuit. Facilities supplies the single-line diagram and submeter records so the assessor can decide which data are acceptable.
- Evidence issue
- One billing period is missing during a supplier change. The utilities analyst requests the original read history and logs the date, owner and resolution.
Gather first
- Meter schedule
- Invoices and interval reads
- Floor plans and area calculations
- Occupancy or operating records
- Current tool rules
How to prepare it
- Assign each meter a serial, location, fuel or resource, period, units, source file and boundary decision. Preserve original documents and log any conversion or allocation.
- Reconcile utility invoice dates and read periods to the agreed 12 months for office energy or water. Flag gaps, estimated bills, overlapping reads, vacancies and load from adjacent areas.
- Have site staff confirm what each shared meter serves. Record the assessor’s rule-based decision and supporting evidence for each exception.
Review
A reviewer can trace each rating input to its original source and each boundary or exception to a documented decision.
Handoff
Send the reconciled pack to the assessor with unresolved questions and named contacts.
Use the issuer’s current instructions and any required forms when you submit.
Office energy and water rules (opens in a new tab)